Registry Twyver House, Bruton Way (8.8 MW rooftop solar)
Registry Twyver House, Bruton Way is an 8.8 MW rooftop solar project in Gloucester, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 21 March 2023; the record was last updated on 29 March 2023.
8.8 MWrooftop solar
application withdrawnstatus in REPD
29 March 2023record last updated
Gloucestercouncil area
Planning timeline
| Date | Stage |
|---|---|
| 2 February 2023 | Application submitted |
| 21 March 2023 | Application withdrawn |
Project details
- Technology
- rooftop solar
- Capacity
- 8.8 MW
- Status (REPD)
- application withdrawn
- Record last updated
- 29 March 2023
- Operator or applicant
- Unknown
- Planning authority
- Gloucester
- Planning application reference
- 22/01202/SOLAR
- Address (REPD)
- Registry Twyver House Bruton Way
- Council area (by location)
- Gloucester
- Name in REPD
- Registry Twyver House, Bruton Way - Solar Panels
- REPD reference
- 13384
Who decides
| Applications | Gloucester | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 19 | 10,236 |
| Refused | 1 (5%) | 19% |
| Solar refused | 1 of 17 | 12% |
| Battery storage refused | 0 of 2 | 16% |
| Median time from submission to decision | 8.0 weeks | 17.0 weeks |
| Appeals lodged / allowed | 0 / 0 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Sudmeadow Road, Hempsted | battery storage | 50 | approved, not built | 1.5 |
| Over Farm | solar farm | 9.9 | approved, not built | 2.6 |
| Bristol Road | battery storage | 20 | permission expired | 3.1 |
| Linton Court Farm, Highnam | battery storage | 99.9 | approved, not built | 3.4 |
| Solar Array at W/O Twigworth And E/O Coxs Brook | solar farm | 16 | approved, not built | 3.5 |
| Maisemore Solar Farm | solar farm | 37 | approved, not built | 3.7 |
| Bengrove Farm, Base Lane | battery storage | 49.9 | application submitted | 4.3 |
| Bengrove Farm, Base Lane Solar Farm | solar farm | 15 | approved, not built | 4.3 |
| Brookthorpe Solar Farm | solar farm | 8 | approved, not built | 4.4 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.8647, -2.2396).