Seghill Household Waste Recovery Centre -Solar Panels (5.8 MW)

Seghill Household Waste Recovery Centre -Solar Panels is a 5.8 MW solar farm project in Northumberland, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 8 December 2025, no decision recorded; the record was last updated on 15 January 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

5.8 MWsolar farm
application submittedstatus in REPD
15 January 2026record last updated
Northumberlandcouncil area

Planning timeline

DateStage
8 December 2025Application submitted

Project details

Technology
solar farm
Capacity
5.8 MW
Status (REPD)
application submitted
Record last updated
15 January 2026
Operator or applicant
Suez Recycling and Recovery UK Limited
Planning authority
Northumberland
Planning application reference
25/04321/RENE
Site area
11.0 ha
Address (REPD)
Seghill Household Waste Recovery Centre, Seaton Delaval, Cramlington
Council area (by location)
Northumberland
REPD reference
19295

Recorded together with Seghill Household Waste Recovery Centre (battery storage, application submitted).

Who decides

ApplicationsNorthumberlandUK
Decided applications (solar, wind, battery)8210,236
Refused31 (38%)19%
Solar refused3 of 3612%
Onshore wind refused25 of 3445%
Battery storage refused3 of 1216%
Median time from submission to decision33.3 weeks17.0 weeks
Appeals lodged / allowed4 / 10—

Other large projects within 10 km

ProjectTypeMWStatuskm
Seghill Household Waste Recovery Centresolar farm5.8application submitted<0.1
Backworth Lane, Backworth Solar Farmsolar farm28approved, not built2.5
Aesica Pharmaceuticalswind farm6refused3.9
Low Hortonbattery storage50approved, not built4.2
Tynemouth Energy Storage System (TESS)battery storage25operational4.6
Benton Lane, Quorum Business Parksolar farm8application submitted5.5
Low Horton Farm Solar Farmsolar farm50approved, not built5.5
Standby Embedded Stor Power Plantbattery storage20under construction7.4
Broadway House Farm Solar Farmsolar farm50approved, not built7.7

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.063, -1.5361).