Solar Farm & Battery Storage at The South Of Holyhead Road Albrighton (23 MW)

Solar Farm & Battery Storage at The South Of Holyhead Road Albrighton is a 23 MW solar farm project in Shropshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational; the record was last updated on 3 June 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

23 MWsolar farm
operationalstatus in REPD
3 June 2025record last updated
Shropshirecouncil area

Planning timeline

DateStage
22 July 2022Application submitted
7 June 2023Planning permission granted

Project details

Technology
solar farm
Capacity
23 MW
Status (REPD)
operational
Record last updated
3 June 2025
Operator or applicant
Low Carbon
Planning authority
Shropshire
Planning application reference
22/03068/FUL
Site area
54.7 ha
Address (REPD)
The South Of Holyhead Road Albrighton
Council area (by location)
Shropshire
Time to decision
46 weeks
Name in REPD
Pepperhill Solar Farm - Solar Farm & Battery Storage
REPD reference
11799

The scheme also includes battery storage, recorded separately in REPD (operational).

Who decides

ApplicationsShropshireUK
Decided applications (solar, wind, battery)9810,236
Refused22 (22%)19%
Solar refused20 of 7812%
Onshore wind refused2 of 345%
Battery storage refused0 of 1716%
Median time from submission to decision15.2 weeks17.0 weeks
Appeals lodged / allowed10 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
County Lane Solar farmsolar farm16approved, not built2.6
Albrighton Solar farmsolar farm15.8operational2.8
Albrighton Substation, Beamish Lanebattery storage7approved, not built2.9
Pool Hall Farm, Lower Pennbattery storage100approved, not built6.5
Chillington Estate, Chillington Parksolar farm40approved, not built6.5
Ebstree Road, Trysull, Seisdonbattery storage99.9approved, not built7.3
Ebstree Road, Trysullbattery storage49.9approved, not built7.3
South Staffordshire Railway Walk, Castlecroftbattery storage50approved, not built7.5
Wolverhampton West Sub Stationbattery storage50permission expired7.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.6172, -2.2715).