Solar Farm at Land At Monks Farm And Trelana Pyworthy Holsworthy (42 MW)

Solar Farm at Land At Monks Farm And Trelana Pyworthy Holsworthy is a 42 MW solar farm project in Torridge, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 10 September 2025; the record was last updated on 4 November 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

42 MWsolar farm
operationalstatus in REPD
4 November 2025record last updated
Torridgecouncil area

Planning timeline

DateStage
21 January 2021Application submitted
10 November 2021Planning permission granted
10 September 2025Operational

Project details

Technology
solar farm
Capacity
42 MW
Status (REPD)
operational
Record last updated
4 November 2025
Operator or applicant
Renewable Energy System Limited / Ripple Energy
Planning authority
Torridge
Planning application reference
1/0249/2021/FULM
Site area
66.3 ha
Address (REPD)
Land At Monks Farm And Trelana Pyworthy Holsworthy
Council area (by location)
Torridge
Time to decision
42 weeks
Contracts for Difference
AR6
Name in REPD
Derril Water Solar Farm - Solar Farm
REPD reference
8802

Who decides

ApplicationsTorridgeUK
Decided applications (solar, wind, battery)4510,236
Refused12 (27%)19%
Solar refused4 of 3112%
Onshore wind refused6 of 845%
Battery storage refused2 of 616%
Median time from submission to decision24.1 weeks17.0 weeks
Appeals lodged / allowed3 / 7—

Other large projects within 10 km

ProjectTypeMWStatuskm
Land At Southland Farm (NOR)solar farm5abandoned1.1
CRINACOTT SOLAR FARM (Pyworthy)solar farm6.7operational1.3
Pinkworthy Farm, Pyworthybattery storage25approved, not built1.5
Stoneworthybattery storage49.9approved, not built1.6
Bradford Solar Parksolar farm5.3operational1.9
Land At Woodlands Farmsolar farm8refused2.2
Pitworthy Farm Solar Parksolar farm15.6operational3.4
Derriton Fields Solar Farmsolar farm11.8operational3.9
Northmoorsolar farm5operational5.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (50.7913, -4.4198).