Third Drove, Fengate (50 MW battery storage)

Third Drove, Fengate is a 50 MW battery storage project in Peterborough, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 5 January 2023, not yet built; the record was last updated on 27 January 2026. REPD also records that the planning permission expired on 5 January 2026, so the project may not go ahead in this form. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

50 MWbattery storage
approved, not builtmay be out of datestatus in REPD
27 January 2026record last updated
Peterboroughcouncil area

REPD also records that the planning permission expired on 5 January 2026, so the project may not go ahead in this form.

Planning timeline

DateStage
16 June 2022Application submitted
5 January 2023Planning permission granted
5 January 2026Permission expired

Project details

Technology
battery storage (stand-alone storage)
Capacity
50 MW
Status (REPD)
approved, not built
Record last updated
27 January 2026
Operator or applicant
Flag Fen Power Limited
Planning authority
Peterborough
Planning application reference
22/00740/FUL
Address (REPD)
Third Drove Fengate
Council area (by location)
Peterborough
Time to decision
29 weeks
Name in REPD
Third Drove, Fengate - Battery Storage
REPD reference
11558

Who decides

ApplicationsPeterboroughUK
Decided applications (solar, wind, battery)3510,236
Refused6 (17%)19%
Solar refused0 of 1912%
Onshore wind refused6 of 645%
Battery storage refused0 of 1016%
Median time from submission to decision12.9 weeks17.0 weeks
Appeals lodged / allowed1 / 3—

Other large projects within 10 km

ProjectTypeMWStatuskm
America Farmsolar farm8application withdrawn2.6
Whittleseywind farm9operational2.6
Kings Dyke, Whittleseybattery storage10approved, not built3.0
Dogsthorpe, Welland Road Solar Farm & Battery Storagesolar farm14approved, not built3.8
Haddon Solar parksolar farm22refused4.7
Willow Hall Farmwind farm10application withdrawn5.1
Gores Wind Farmwind farm16application withdrawn6.2
Farms of Newboroughsolar farm49application withdrawn8.3
Glass Moorwind farm16operational8.7

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.5702, -0.2054).