Woodlands Wind Farm (15 MW)

Woodlands Wind Farm is a 15 MW wind farm project in Highland, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 15 October 2014; the record was last updated on 16 December 2014.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

15 MWwind farm
application withdrawnstatus in REPD
16 December 2014record last updated
Highlandcouncil area

Planning timeline

DateStage
16 December 2013Application submitted
15 October 2014Application withdrawn

Project details

Technology
wind farm
Capacity
15 MW
Status (REPD)
application withdrawn
Record last updated
16 December 2014
Operator or applicant
Woodlands Wind Farm Ltd
Planning authority
Highland
Planning application reference
13/04703/FUL
Turbines
5
Address (REPD)
Land At Woodlands Farm Dingwall
Council area (by location)
Highland
REPD reference
4308

Who decides

ApplicationsHighlandUK
Decided applications (solar, wind, battery)16010,236
Refused68 (42%)19%
Solar refused0 of 1512%
Onshore wind refused61 of 11445%
Battery storage refused7 of 3116%
Median time from submission to decision52.3 weeks17.0 weeks
Appeals lodged / allowed20 / 20—

Other large projects within 10 km

ProjectTypeMWStatuskm
Ceislein Wind Farmwind farm77application submitted3.1
Ceislein Wind Farmbattery storage65application submitted3.1
Drumore Cottage, Swordalebattery storage49.9approved, not built4.0
Clach Liath Wind Farmwind farm42.5refused7.2
Bendealt Wind Farm, Highlandwind farm9operational9.1
Meall an Tuirc Wind Farmwind farm17operational9.6
Novar Wind Farm (Extension)wind farm36.8operational9.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (57.6242, -4.4085).