Energy Projects Near You

Auchrobert Wind Farm (36 MW)

Auchrobert Wind Farm is a 36 MW wind farm project in South Lanarkshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 20 March 2017; the record was last updated on 25 October 2017.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

36 MWwind farm
operationalstatus in REPD
25 October 2017record last updated
South Lanarkshirecouncil area

Planning timeline

DateStage
14 December 2012Application submitted
9 April 2014Planning permission granted
1 April 2015Construction started
20 March 2017Operational

Project details

Technology
wind farm
Capacity
36 MW
Status (REPD)
operational
Record last updated
25 October 2017
Operator or applicant
Falck Renewables
Planning authority
South Lanarkshire
Planning application reference
CL/12/0556
Turbines
12
Address (REPD)
South Lanarkshire ML11 0HP
Council area (by location)
South Lanarkshire
Time to decision
69 weeks
REPD reference
4337

Who decides

ApplicationsSouth LanarkshireUK
Decided applications (solar, wind, battery)8910,236
Refused30 (34%)19%
Solar refused2 of 2012%
Onshore wind refused21 of 5645%
Battery storage refused7 of 1316%
Median time from submission to decision47.4 weeks17.0 weeks
Appeals lodged / allowed6 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Kype Muir Wind Farmwind farm88.4operational3.4
Kype Muir Wind Farm Extensionwind farm67.2operational3.4
Wind turbines at Hawkwood Wind Farm Kype Highway Strathavenwind farm33application submitted4.8
Nutberry Wind Farmwind farm15operational4.8
Nutberrywind farm60application withdrawn5.0
Cumberhead Wind Farmwind farm48operational6.0
Rogerhill Solar and Battery Energy Storage Systemsolar farm100application submitted6.5
Cumberhead West Wind Farmwind farm126under construction6.7
Carlisle Roadbattery storage200approved, not built6.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.624, -3.9842).