Balnacoil Wind Farm (45 MW)

Balnacoil Wind Farm is a 45 MW wind farm project in Highland, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 18 March 2014; the record was last updated on 16 September 2014.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

45 MWwind farm
refusedstatus in REPD
16 September 2014record last updated
Highlandcouncil area

Planning timeline

DateStage
4 September 2013Application submitted
18 March 2014Refused by the planning authority

Project details

Technology
wind farm
Capacity
45 MW
Status (REPD)
refused
Record last updated
16 September 2014
Operator or applicant
Vento Ludens
Planning authority
Highland
Planning application reference
13/03312/FUL
Appeal reference
14/00019/REFBS
Turbines
15
Address (REPD)
Balnacoil Lodge Brora KW9 6LX
Council area (by location)
Highland
Time to decision
28 weeks
REPD reference
4537

Who decides

ApplicationsHighlandUK
Decided applications (solar, wind, battery)16010,236
Refused68 (42%)19%
Solar refused0 of 1512%
Onshore wind refused61 of 11445%
Battery storage refused7 of 3116%
Median time from submission to decision52.3 weeks17.0 weeks
Appeals lodged / allowed20 / 20—

Other large projects within 10 km

ProjectTypeMWStatuskm
Gordonbush (extension)wind farm47operational4.2
Kilbraur Windfarmwind farm47.5operational4.3
Gordonbushwind farm70operational4.3
South Kilbraur Wind Farmwind farm28refused4.8
Strathborawind farm46application withdrawn8.5
Tressady Wind Farmwind farm32.5refused on appeal9.4
Kilbraur Windfarm Farlary - Extensionwind farm20operational9.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (58.0749, -4.0261).