Basing Road (20 MW battery storage)

Basing Road is a 20 MW battery storage project in Basingstoke and Deane, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 20 July 2021, no decision recorded; the record was last updated on 24 February 2023. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

20 MWbattery storage
application submittedmay be out of datestatus in REPD
24 February 2023record last updated
Basingstoke and Deanecouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
20 July 2021Application submitted

Project details

Technology
battery storage (stand-alone storage)
Capacity
20 MW
Status (REPD)
application submitted
Record last updated
24 February 2023
Operator or applicant
Eco-Economix
Planning authority
Basingstoke and Deane
Planning application reference
21/02412/FUL
Address (REPD)
Land At, Basing Road, Old Basing, Basingstoke,
Council area (by location)
Basingstoke and Deane
REPD reference
7746

Who decides

ApplicationsBasingstoke and DeaneUK
Decided applications (solar, wind, battery)3010,236
Refused8 (27%)19%
Solar refused5 of 2212%
Onshore wind refused1 of 145%
Battery storage refused2 of 716%
Median time from submission to decision26.3 weeks17.0 weeks
Appeals lodged / allowed4 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Chineham Battery Energy Storage Facilitybattery storage15application withdrawn2.5
Beaurepaire Farmsolar farm12refused5.6
Manor Farm, Sherborne Solar Farmsolar farm28application submitted5.7
Frying Down Copse Solar Farmsolar farm5operational6.1
Minchens Lane Battery Storage Facilitybattery storage100operational7.0
Chosley Farm, North Warnborough Solar Farm and Battery storagesolar farm49.9approved, not built7.5
Frog Lane, Little Londonbattery storage115refused7.7
Bramley Frith Solar Farmsolar farm49.9approved, not built7.8
Ash Lane, Little Londonbattery storage57approved, not built8.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.2688, -1.0621).