Frog Lane, Little London (115 MW battery storage)

Frog Lane, Little London is a 115 MW battery storage project in Basingstoke and Deane, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 21 May 2026; the record was last updated on 19 June 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

115 MWbattery storage
refusedstatus in REPD
19 June 2026record last updated
Basingstoke and Deanecouncil area

Planning timeline

DateStage
24 April 2025Application submitted
21 May 2026Refused by the planning authority

Project details

Technology
battery storage (stand-alone storage)
Capacity
115 MW
Status (REPD)
refused
Record last updated
19 June 2026
Operator or applicant
British Solar Renewables
Planning authority
Basingstoke and Deane
Planning application reference
25/01019/FUL
Address (REPD)
Land At Frog Lane Little London
Council area (by location)
Basingstoke and Deane
Time to decision
56 weeks
Name in REPD
Frog Lane, Little London - Battery Energy Storage
REPD reference
14169

Who decides

ApplicationsBasingstoke and DeaneUK
Decided applications (solar, wind, battery)3010,236
Refused8 (27%)19%
Solar refused5 of 2212%
Onshore wind refused1 of 145%
Battery storage refused2 of 716%
Median time from submission to decision26.3 weeks17.0 weeks
Appeals lodged / allowed4 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Ash Lane, Little Londonbattery storage57approved, not built0.5
Bramley Frith Solar Farmsolar farm49.9approved, not built1.6
Withy Place, Bramley Roadbattery storage50approved, not built1.8
Minchens Lane Battery Storage Facilitybattery storage100operational1.8
Beaurepaire Farmsolar farm12refused2.4
Manor Farm, Sherborne Solar Farmsolar farm28application submitted5.0
Chineham Battery Energy Storage Facilitybattery storage15application withdrawn5.3
Basing Roadbattery storage20application submitted7.7
Bloomfield Hatch Farm Solar Farm & Batterysolar farm25.8approved, not built7.7

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.3354, -1.0916).