Withy Place, Bramley Road (50 MW battery storage)

Withy Place, Bramley Road is a 50 MW battery storage project in Basingstoke and Deane, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 2 July 2025, not yet built; the record was last updated on 28 July 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

50 MWbattery storage
approved, not builtstatus in REPD
28 July 2025record last updated
Basingstoke and Deanecouncil area

Planning timeline

DateStage
2 September 2024Application submitted
2 July 2025Planning permission granted
2 July 2028Permission due to expire (unless work starts)

Project details

Technology
battery storage (stand-alone storage)
Capacity
50 MW
Status (REPD)
approved, not built
Record last updated
28 July 2025
Operator or applicant
Root Power South Limited
Planning authority
Basingstoke and Deane
Planning application reference
24/01913/FUL
Address (REPD)
Withy Place Bramley Road Silchester
Council area (by location)
Basingstoke and Deane
Time to decision
43 weeks
Name in REPD
Withy Place, Bramley Road - Battery Energy Storage
REPD reference
17240

Who decides

ApplicationsBasingstoke and DeaneUK
Decided applications (solar, wind, battery)3010,236
Refused8 (27%)19%
Solar refused5 of 2212%
Onshore wind refused1 of 145%
Battery storage refused2 of 716%
Median time from submission to decision26.3 weeks17.0 weeks
Appeals lodged / allowed4 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Bramley Frith Solar Farmsolar farm49.9approved, not built0.7
Ash Lane, Little Londonbattery storage57approved, not built1.3
Minchens Lane Battery Storage Facilitybattery storage100operational1.5
Frog Lane, Little Londonbattery storage115refused1.8
Beaurepaire Farmsolar farm12refused3.9
Bloomfield Hatch Farm Solar Farm & Batterysolar farm25.8approved, not built6.0
Chineham Battery Energy Storage Facilitybattery storage15application withdrawn6.2
Manor Farm, Sherborne Solar Farmsolar farm28application submitted6.6
Sulhamstead Solar Field - Stud Farmsolar farm5approved, not built7.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.3448, -1.0712).