Charity Farm (32 MW wind farm)
Charity Farm is a 32 MW wind farm project in East Riding of Yorkshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 1 March 2011; the record was last updated on 1 March 2011.
32 MWwind farm
application withdrawnstatus in REPD
1 March 2011record last updated
East Riding of Yorkshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 3 August 2009 | Application submitted |
| 1 March 2011 | Application withdrawn |
Project details
- Technology
- wind farm
- Capacity
- 32 MW
- Status (REPD)
- application withdrawn
- Record last updated
- 1 March 2011
- Operator or applicant
- Npower
- Planning authority
- East Riding of Yorkshire
- Planning application reference
- 09/02564/STPLFE
- Turbines
- 16
- Address (REPD)
- Swine Fleet Road, Goole Fields, Goole, Humbs. DN14 8AU
- Council area (by location)
- East Riding of Yorkshire
- REPD reference
- 3540
Who decides
| Applications | East Riding of Yorkshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 143 | 10,236 |
| Refused | 26 (18%) | 19% |
| Solar refused | 1 of 59 | 12% |
| Onshore wind refused | 24 of 63 | 45% |
| Battery storage refused | 1 of 21 | 16% |
| Median time from submission to decision | 18.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 4 / 10 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Goole Fields ll Wind Farm | wind farm | 34.9 | operational | 1.8 |
| Goole Fields | wind farm | 32.8 | operational | 2.3 |
| Rawcliffe Bridge Wind Farm | wind farm | 10 | refused | 4.3 |
| Rawcliffe Estate, Bridge Lane Solar Farm | solar farm | 6 | approved, not built | 6.0 |
| Thorne Farm | solar farm | 5 | operational | 6.6 |
| Old River Don Wind Farm | wind farm | 18 | refused | 7.4 |
| Sixpenny Wood Windfarm | wind farm | 33 | operational | 7.5 |
| Tween Bridge Windfarm | wind farm | 44 | operational | 7.8 |
| East Yorkshire Solar Farm | solar farm | 400 | approved, not built | 7.8 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.6765, -0.8599).