Old River Don Wind Farm (18 MW)
Old River Don Wind Farm is an 18 MW wind farm project in North Lincolnshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 23 September 2015; the record was last updated on 6 October 2015.
18 MWwind farm
refusedstatus in REPD
6 October 2015record last updated
North Lincolnshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 30 June 2014 | Application submitted |
| 23 September 2015 | Refused by the planning authority |
Project details
- Technology
- wind farm
- Capacity
- 18 MW
- Status (REPD)
- refused
- Record last updated
- 6 October 2015
- Operator or applicant
- REG Windpower
- Planning authority
- North Lincolnshire
- Planning application reference
- WF/2014/0710
- Turbines
- 6
- Address (REPD)
- Land off, Godnow Road, Crowle
- Council area (by location)
- North Lincolnshire
- Time to decision
- 64 weeks
- REPD reference
- 4405
Who decides
| Applications | North Lincolnshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 47 | 10,236 |
| Refused | 15 (32%) | 19% |
| Solar refused | 7 of 33 | 12% |
| Onshore wind refused | 8 of 10 | 45% |
| Battery storage refused | 0 of 4 | 16% |
| Median time from submission to decision | 10.0 weeks | 17.0 weeks |
| Appeals lodged / allowed | 6 / 4 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Twin Rivers | wind farm | 28.7 | operational | 2.3 |
| Tween Bridge Windfarm | wind farm | 44 | operational | 4.6 |
| The Tween Bridge Solar Farm | solar farm | 800 | application submitted | 4.6 |
| Thorne Farm | solar farm | 5 | operational | 5.1 |
| Solar Farm at Ealand Road | solar farm | 49.9 | application submitted | 6.3 |
| Goole Fields | wind farm | 32.8 | operational | 6.3 |
| Keadby Wind Farm | wind farm | 68 | operational | 7.0 |
| Charity Farm | wind farm | 32 | application withdrawn | 7.4 |
| Goole Fields ll Wind Farm | wind farm | 34.9 | operational | 7.5 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.6102, -0.8696).