Rawcliffe Bridge Wind Farm (10 MW)

Rawcliffe Bridge Wind Farm is a 10 MW wind farm project in East Riding of Yorkshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 24 February 2015; the record was last updated on 7 April 2015.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

10 MWwind farm
refusedstatus in REPD
7 April 2015record last updated
East Riding of Yorkshirecouncil area

Planning timeline

DateStage
4 February 2014Application submitted
24 February 2015Refused by the planning authority

Project details

Technology
wind farm
Capacity
10 MW
Status (REPD)
refused
Record last updated
7 April 2015
Operator or applicant
Airvolution Energy
Planning authority
East Riding of Yorkshire
Planning application reference
13/04183/STPLFE
Turbines
5
Address (REPD)
Rawcliffe Bridge, nr Goole
Council area (by location)
East Riding of Yorkshire
Time to decision
55 weeks
REPD reference
4548

Who decides

ApplicationsEast Riding of YorkshireUK
Decided applications (solar, wind, battery)14310,236
Refused26 (18%)19%
Solar refused1 of 5912%
Onshore wind refused24 of 6345%
Battery storage refused1 of 2116%
Median time from submission to decision18.9 weeks17.0 weeks
Appeals lodged / allowed4 / 10—

Other large projects within 10 km

ProjectTypeMWStatuskm
Rawcliffe Estate, Bridge Lane Solar Farmsolar farm6approved, not built1.8
Goole Fields ll Wind Farmwind farm34.9operational2.5
Goole Fieldswind farm32.8operational2.8
Charity Farmwind farm32application withdrawn4.3
Thorne Farmsolar farm5operational4.8
Rusholme Grangebattery storage40operational5.9
Rusholme Wind Farmwind farm24operational5.9
Tween Bridge Windfarmwind farm44operational6.3
Carlton Solar Farmsolar farm50approved, not built6.4

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.6788, -0.9252).