Gravel Farm, Cleeve Solar Farm (32 MW)

Gravel Farm, Cleeve Solar Farm is a 32 MW solar farm project in Forest of Dean, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 29 February 2024; the record was last updated on 2 April 2024.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

32 MWsolar farm
application withdrawnstatus in REPD
2 April 2024record last updated
Forest of Deancouncil area

Planning timeline

DateStage
26 January 2023Application submitted
29 February 2024Application withdrawn

Project details

Technology
solar farm
Capacity
32 MW
Status (REPD)
application withdrawn
Record last updated
2 April 2024
Operator or applicant
Relay Gravel Limited
Planning authority
Forest of Dean
Planning application reference
P1773/22/FUL
Site area
47.6 ha
Address (REPD)
Gravel Farm Cleeve
Council area (by location)
Forest of Dean
Name in REPD
Gravel Farm, Cleeve - Solar Farm
REPD reference
13213

Who decides

ApplicationsForest of DeanUK
Decided applications (solar, wind, battery)2810,236
Refused8 (29%)19%
Solar refused7 of 2612%
Battery storage refused1 of 216%
Median time from submission to decision14.1 weeks17.0 weeks
Appeals lodged / allowed2 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Stantway Solar Farmsolar farm5operational0.9
Solar PV Panels & Battery Storage Facilitysolar farm49.9application withdrawn2.3
Solar PV Panels & Battery Storage Facilitybattery storage49.9application withdrawn2.3
Cowles Farmsolar farm5refused on appeal3.2
Epney, Framilode Solar Farm & Battery Storagesolar farm49.5refused3.9
Awre Penisular Farmer's Community Solar Schemesolar farm49.9refused4.5
Northington Lanebattery storage35approved, not built4.8
High Green Longney Estate Solar Farmsolar farm20permission expired4.9
High Green Longney Estate Solar Farmsolar farm25permission expired4.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.8128, -2.3977).