High Green Longney Estate Solar Farm (25 MW)

High Green Longney Estate Solar Farm is a 25 MW solar farm project in Stroud, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: planning permission expired on 26 September 2022; the record was last updated on 2 September 2020.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

25 MWsolar farm
permission expiredstatus in REPD
2 September 2020record last updated
Stroudcouncil area

Planning timeline

DateStage
5 March 2018Application submitted
30 November 2018Refused by the planning authority
29 May 2019Appeal lodged
26 September 2019Planning permission granted
26 September 2019Appeal allowed
26 September 2022Permission expired

Project details

Technology
solar farm
Capacity
25 MW
Status (REPD)
permission expired
Record last updated
2 September 2020
Operator or applicant
Elgin Energy
Planning authority
Stroud
Planning application reference
S.18/0537/FUL
Appeal reference
APP/C1625/W/19/3229860
Site area
40.9 ha
Address (REPD)
Land To The East Of High Green, Longney, Gloucester
Council area (by location)
Stroud
Time to decision
81 weeks
Contracts for Difference
AR4
Name in REPD
High Green Longney Estate - Solar Farm
REPD reference
6580

Who decides

ApplicationsStroudUK
Decided applications (solar, wind, battery)3410,236
Refused8 (24%)19%
Solar refused4 of 2512%
Onshore wind refused3 of 445%
Battery storage refused1 of 516%
Median time from submission to decision17.6 weeks17.0 weeks
Appeals lodged / allowed1 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
High Green Longney Estate Solar Farmsolar farm20permission expired<0.1
Moreton Lane Solar Farm & Battery Storagesolar farm49.9approved, not built1.7
Epney, Framilode Solar Farm & Battery Storagesolar farm49.5refused1.7
Gravel Farm, Cleeve Solar Farmsolar farm32application withdrawn4.9
Stantway Solar Farmsolar farm5operational5.2
Bristol Roadbattery storage20permission expired5.7
Brookthorpe Solar Farmsolar farm8approved, not built6.0
Solar PV Panels & Battery Storage Facilitybattery storage49.9application withdrawn6.2
Solar PV Panels & Battery Storage Facilitysolar farm49.9application withdrawn6.2

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.8076, -2.3267).