Greybarn Solar Energy Farm (41.5 MW)

Greybarn Solar Energy Farm is a 41.5 MW solar farm project in Mid Suffolk, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 21 March 2022, no decision recorded; the record was last updated on 8 October 2024. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

41.5 MWsolar farm
application submittedmay be out of datestatus in REPD
8 October 2024record last updated
Mid Suffolkcouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
21 March 2022Application submitted

Project details

Technology
solar farm
Capacity
41.5 MW
Status (REPD)
application submitted
Record last updated
8 October 2024
Operator or applicant
Statkraft UK
Planning authority
Mid Suffolk
Planning application reference
DC/22/01243
Site area
60.0 ha
Address (REPD)
Greybarn Solar Energy Farm Land At Bramford, Flowton And Burstall
Council area (by location)
Mid Suffolk
REPD reference
9104

The scheme also includes 55 MW of battery storage, recorded separately in REPD (application submitted).

Who decides

ApplicationsMid SuffolkUK
Decided applications (solar, wind, battery)3310,236
Refused5 (15%)19%
Solar refused3 of 1912%
Onshore wind refused1 of 245%
Battery storage refused1 of 1216%
Median time from submission to decision22.4 weeks17.0 weeks
Appeals lodged / allowed2 / 2—

Other large projects within 10 km

ProjectTypeMWStatuskm
Church Farm, The Channel - Bramford Solar Farm and Battery Storagesolar farm49.9approved, not built0.8
Bramford Substationbattery storage57operational2.3
Bullen Lane, Bramfordbattery storage400approved, not built2.5
Tye Lane Solar Farmsolar farm49.9under construction3.3
Bullen Lanebattery storage100under construction4.3
Masons Landfill, Bramford Road, Great Blakenham Solar Farmsolar farm6.1approved, not built5.8
Land at Hill Farmsolar farm10application withdrawn5.9
Hill Farm (Baylham)solar farm10application withdrawn5.9
Coxhall Road, Tattingstonebattery storage5approved, not built9.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.0726, 1.0318).