Tye Lane Solar Farm (49.9 MW)

Tye Lane Solar Farm is a 49.9 MW solar farm project in Mid Suffolk, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: under construction since 1 January 2025; the record was last updated on 6 March 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

49.9 MWsolar farm
under constructionstatus in REPD
6 March 2026record last updated
Mid Suffolkcouncil area

Planning timeline

DateStage
2 September 2021Application submitted
18 December 2023Planning permission granted
1 January 2025Construction started

Project details

Technology
solar farm
Capacity
49.9 MW
Status (REPD)
under construction
Record last updated
6 March 2026
Operator or applicant
EDF Energy Renewables
Planning authority
Mid Suffolk
Planning application reference
DC/21/04711
Site area
85.0 ha
Address (REPD)
N/O Tye Lane, Bramford, Ipswich
Council area (by location)
Mid Suffolk
Time to decision
120 weeks
Name in REPD
Tye Lane - Solar Farm
REPD reference
9610

The scheme also includes battery storage, recorded separately in REPD (operational).

Who decides

ApplicationsMid SuffolkUK
Decided applications (solar, wind, battery)3310,236
Refused5 (15%)19%
Solar refused3 of 1912%
Onshore wind refused1 of 245%
Battery storage refused1 of 1216%
Median time from submission to decision22.4 weeks17.0 weeks
Appeals lodged / allowed2 / 2—

Other large projects within 10 km

ProjectTypeMWStatuskm
Bullen Lane, Bramfordbattery storage400approved, not built0.9
Bullen Lanebattery storage100under construction1.4
Bramford Substationbattery storage57operational1.5
Church Farm, The Channel - Bramford Solar Farm and Battery Storagesolar farm49.9approved, not built2.6
Masons Landfill, Bramford Road, Great Blakenham Solar Farmsolar farm6.1approved, not built3.0
Greybarn Solar Energy Farmsolar farm41.5application submitted3.3
Land at Hill Farmsolar farm10application withdrawn3.7
Hill Farm (Baylham)solar farm10application withdrawn3.8
Coxhall Road, Tattingstonebattery storage5approved, not built9.4

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.0838, 1.0771).