Energy Projects Near You

Hassiewells (6.9 MW wind farm)

Hassiewells is a 6.9 MW wind farm project in Aberdeenshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on appeal on 23 July 2014; the record was last updated on 1 September 2014.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6.9 MWwind farm
refused on appealstatus in REPD
1 September 2014record last updated
Aberdeenshirecouncil area

Planning timeline

DateStage
21 January 2013Application submitted
7 May 2014Refused by the planning authority
23 July 2014Appeal refused

Project details

Technology
wind farm
Capacity
6.9 MW
Status (REPD)
refused on appeal
Record last updated
1 September 2014
Operator or applicant
Hassiewells Renewables
Planning authority
Aberdeenshire
Planning application reference
APP/2013/0157
Appeal reference
APPEAL/2014/0001
Turbines
3
Address (REPD)
Rothienorman, Inverurie, Grampian, AB51 8XX
Council area (by location)
Aberdeenshire
Time to decision
67 weeks
REPD reference
4375

Who decides

ApplicationsAberdeenshireUK
Decided applications (solar, wind, battery)20010,236
Refused64 (32%)19%
Solar refused1 of 4012%
Onshore wind refused60 of 13245%
Battery storage refused3 of 2816%
Median time from submission to decision40.6 weeks17.0 weeks
Appeals lodged / allowed15 / 13—

Other large projects within 10 km

ProjectTypeMWStatuskm
Floors Farm Wind Turbineswind farm6.9refused2.2
Redhill Farmswind farm6refused4.3
Gordonstown Hill Wind Farmwind farm12.5operational5.0
Glens of Foudlandwind farm26operational5.2
Shielburn Farmwind farm6.9operational5.5
Overhill Farm, Rothienormanbattery storage49.9under construction5.9
Middleton Of Blackhills, Rothienormanbattery storage49.9application submitted5.9
Rothienormanbattery storage49.9approved, not built7.1
Glens of Foudland Wind Farm (Extension)wind farm14application withdrawn7.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (57.4517, -2.5636).