Glens of Foudland Wind Farm (Extension) (14 MW)

Glens of Foudland Wind Farm (Extension) is a 14 MW wind farm project in Aberdeenshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 17 February 2016; the record was last updated on 4 March 2015.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

14 MWwind farm
application withdrawnstatus in REPD
4 March 2015record last updated
Aberdeenshirecouncil area

Planning timeline

DateStage
6 August 2015Application submitted
17 February 2016Application withdrawn

Project details

Technology
wind farm
Capacity
14 MW
Status (REPD)
application withdrawn
Record last updated
4 March 2015
Operator or applicant
GLID Wind Farms
Planning authority
Aberdeenshire
Planning application reference
APP/2015/2391
Turbines
7
Turbine height
100 m
Address (REPD)
Glens Of Foudland Wind Farm, Hill Of Bainshole, Bainshole, Huntly, Grampian
Council area (by location)
Aberdeenshire
REPD reference
5587

Who decides

ApplicationsAberdeenshireUK
Decided applications (solar, wind, battery)20010,236
Refused64 (32%)19%
Solar refused1 of 4012%
Onshore wind refused60 of 13245%
Battery storage refused3 of 2816%
Median time from submission to decision40.6 weeks17.0 weeks
Appeals lodged / allowed15 / 13—

Other large projects within 10 km

ProjectTypeMWStatuskm
Hill of Stoneyfieldwind farm14.4application submitted0.7
Glens of Foudlandwind farm26operational2.1
Stony Hillwind farm18application withdrawn4.1
Dummuiewind farm12.3operational5.2
Redhill Farmswind farm6refused7.1
Hassiewellswind farm6.9refused on appeal7.1
Hill of Tillymorgan (Kirkton Farm) Wind turbineswind farm9.6operational7.7
Overhill Farm, Rothienormanbattery storage49.9under construction7.9
Middleton Of Blackhills, Rothienormanbattery storage49.9application submitted7.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (57.4091, -2.6531).