Haxted Mead, Lingfield Solar Farm (50 MW)
Haxted Mead, Lingfield Solar Farm is a 50 MW solar farm project in Tandridge, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 8 July 2025, no decision recorded; the record was last updated on 1 September 2025.
50 MWsolar farm
application submittedstatus in REPD
1 September 2025record last updated
Tandridgecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 8 July 2025 | Application submitted |
Project details
- Technology
- solar farm
- Capacity
- 50 MW
- Status (REPD)
- application submitted
- Record last updated
- 1 September 2025
- Operator or applicant
- Haxted Mead Solar Farm Limited
- Planning authority
- Tandridge
- Planning application reference
- 2025/644
- Site area
- 89.0 ha
- Address (REPD)
- Haxted Mead, Lingfield
- Council area (by location)
- Tandridge
- Name in REPD
- Haxted Mead, Lingfield - Solar Farm
- REPD reference
- 19401
Who decides
Tandridge has 9 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Land at Barrow Green Farm | solar farm | 5 | refused | 1.8 |
| Gaywood Solar Farm | solar farm | 10.7 | approved, not built | 3.3 |
| Gaywood Farm | battery storage | 7.5 | permission expired | 3.4 |
| Skinners Farm | solar farm | 6 | refused on appeal | 3.9 |
| Worsted Farm | solar farm | 5 | operational | 7.4 |
| Redeham Hall Solar Farm | solar farm | 5.3 | refused on appeal | 9.9 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.191, 0.0235).