Howick Hall Farm (49.9 MW battery storage)

Howick Hall Farm is a 49.9 MW battery storage project in South Ribble, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 21 January 2021, no decision recorded; the record was last updated on 18 March 2021. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

49.9 MWbattery storage
application submittedmay be out of datestatus in REPD
18 March 2021record last updated
South Ribblecouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
21 January 2021Application submitted

Project details

Technology
battery storage (stand-alone storage)
Capacity
49.9 MW
Status (REPD)
application submitted
Record last updated
18 March 2021
Operator or applicant
Penwortham Storage Limited
Planning authority
South Ribble
Planning application reference
07/2021/00252/FUL
Address (REPD)
Howick Hall Farm Howick Cross Lane Penwortham Preston Lancashire PR1 0NS
Council area (by location)
South Ribble
Name in REPD
Howick Hall Farm - Battery Storage Facility
REPD reference
8829

Who decides

ApplicationsSouth RibbleUK
Decided applications (solar, wind, battery)1310,236
Refused0 (0%)19%
Solar refused0 of 912%
Battery storage refused0 of 416%
Median time from submission to decision6.0 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Penworthambattery storage57approved, not built0.4
Penwortham Sub Stationbattery storage50permission expired0.5
Clifton Marsh Farm, Preston New Road Solar Farmsolar farm49.9application submitted4.6
Oakfield Farmsolar farm5operational4.9
The Glowhousebattery storage5under construction5.6
Cooper House Farmsolar farm5operational8.6
Lower House Farm, Lewth Lane Solar Farmsolar farm20approved, not built9.3
Newfold Solar Farmsolar farm5abandoned9.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.7463, -2.7503).