Lime Down Solar Project (500 MW)

Lime Down Solar Project is a 500 MW solar farm project in Wiltshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 17 October 2025, no decision recorded; the record was last updated on 26 June 2026. As a nationally significant project, it is decided by the Secretary of State for Energy Security and Net Zero on a Development Consent Order after examination by the Planning Inspectorate (EN010168).

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

500 MWsolar farm
application submittedstatus in REPD
26 June 2026record last updated
Wiltshirecouncil area

Planning timeline

DateStage
17 October 2025Application submitted

Project details

Technology
solar farm
Capacity
500 MW
Status (REPD)
application submitted
Record last updated
26 June 2026
Operator or applicant
Island Green Power
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application reference
EN010168
Site area
1,237.0 ha
Address (REPD)
W/O Corston, N/O Hullavington, Chippenham
Council area (by location)
Wiltshire
Name in REPD
Lime Down - Solar Project
REPD reference
16063

Recorded together with Lime Down (500 MW battery storage, application submitted).

Official project record at the Planning Inspectorate (EN010168)

Who decides

As a nationally significant project, it is decided by the Secretary of State for Energy Security and Net Zero on a Development Consent Order after examination by the Planning Inspectorate (EN010168). All Energy Secretary decisions on solar and wind farms. The Planning Inspectorate - National Infrastructure refused 7% of 46 decided solar, wind and battery applications in REPD (median 73 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Hullavington Solar Parksolar farm7operational3.1
Leigh Delamere Solar farm & Battery storagesolar farm49.9under construction6.1
Rodbourne Rail Farm Solar Parksolar farm7.6operational6.9
Castle Combe Circuitsolar farm12operational7.6
Red Barn Solar Farm & Battery Storagesolar farm40approved, not built8.4
Tiddlywink Barn Battery Storage Power Plantbattery storage20abandoned9.0
Solar Farm at East of Battens Farmsolar farm10approved, not built9.0
Crudwell Road Solar Farm & Battery Storagesolar farm49.9approved, not built9.0