Loch Awe - Eredine Wind Farm (100 MW)

Loch Awe - Eredine Wind Farm is a 100 MW wind farm project in Argyll and Bute, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 20 November 2024, no decision recorded; the record was last updated on 13 December 2024. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

100 MWwind farm
application submittedstatus in REPD
13 December 2024record last updated
Argyll and Butecouncil area

Planning timeline

DateStage
20 November 2024Application submitted

Project details

Technology
wind farm
Capacity
100 MW
Status (REPD)
application submitted
Record last updated
13 December 2024
Operator or applicant
RWE Renewables UK Limited
Planning authority
Scottish Government (S36)
Planning application reference
ECU00004517
Turbines
22
Turbine height
200 m
Address (REPD)
Btw Loch Awe & Loch Fyne, Lochgilphead
Council area (by location)
Argyll and Bute
REPD reference
11667

The scheme also includes battery storage, recorded separately in REPD (application submitted).

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
An Suidhewind farm19.3operational3.3
Ardchonnel Wind Farmwind farm45refused on appeal5.7
An Carr Dubh Wind Farmwind farm85.8application submitted6.1
A'Chruach (Phase 1)wind farm48.3operational6.6
Inverlieverwind farm47.5refused8.4
Blarghour Wind Farmwind farm84approved, not built9.3

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (56.2077, -5.2693).