Rotsea Wind Farm (6.9 MW)

Rotsea Wind Farm is a 6.9 MW wind farm project in East Riding of Yorkshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 5 November 2015; the record was last updated on 2 December 2015.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6.9 MWwind farm
refusedstatus in REPD
2 December 2015record last updated
East Riding of Yorkshirecouncil area

Planning timeline

DateStage
15 November 2013Application submitted
5 November 2015Refused by the planning authority

Project details

Technology
wind farm
Capacity
6.9 MW
Status (REPD)
refused
Record last updated
2 December 2015
Operator or applicant
Renewable Energy Systems (RES)
Planning authority
East Riding of Yorkshire
Planning application reference
13/03606/STPLFE
Turbines
3
Address (REPD)
Land East Of Scurf Dyke Farm Watton Carrs Road Hutton Cranswick East Riding Of Yorkshire
Council area (by location)
East Riding of Yorkshire
Time to decision
103 weeks
REPD reference
4243

Who decides

ApplicationsEast Riding of YorkshireUK
Decided applications (solar, wind, battery)14310,236
Refused26 (18%)19%
Solar refused1 of 5912%
Onshore wind refused24 of 6345%
Battery storage refused1 of 2116%
Median time from submission to decision18.9 weeks17.0 weeks
Appeals lodged / allowed4 / 10—

Other large projects within 10 km

ProjectTypeMWStatuskm
Scurf Dyke Solar Farmsolar farm49.9approved, not built2.1
Back Lane, Skerne Solar Farm & Battery Storagesolar farm45approved, not built4.9
Sunderlandwick Solar Farmsolar farm49.9approved, not built5.8
Hall Farm Routhwind farm24.6operational7.7
Field House Solar Farmsolar farm40approved, not built8.5
Lissett Airfield Wind Farm Extensionwind farm12.5appeal withdrawn8.8
Carr Lane, Tickton Solar Farmsolar farm49.9approved, not built8.9
Lissett Airfield Wind Farmwind farm30operational9.6
Bonwickwind farm17refused9.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.9417, -0.3833).