Westnewton (withdrawn) (10 MW wind farm)

Westnewton (withdrawn) is a 10 MW wind farm project in Cumberland, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 12 June 2008; the record was last updated on 23 March 2009.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

10 MWwind farm
application withdrawnstatus in REPD
23 March 2009record last updated
Cumberlandcouncil area

Planning timeline

DateStage
5 September 2007Application submitted
12 June 2008Application withdrawn

Project details

Technology
wind farm
Capacity
10 MW
Status (REPD)
application withdrawn
Record last updated
23 March 2009
Operator or applicant
Unknown
Planning authority
Cumberland
Planning application reference
2/2007/0909
Turbines
5
Address (REPD)
Aspatria
Council area (by location)
Cumberland
REPD reference
3039

Who decides

ApplicationsCumberlandUK
Decided applications (solar, wind, battery)9110,236
Refused30 (33%)19%
Solar refused4 of 3212%
Onshore wind refused25 of 4545%
Battery storage refused1 of 1416%
Median time from submission to decision22.4 weeks17.0 weeks
Appeals lodged / allowed7 / 9—

Other large projects within 10 km

ProjectTypeMWStatuskm
Westnewtonwind farm6.2operational0.9
Warwick Hallwind farm12refused1.5
Aspatriasolar farm19operational1.8
West Newtonsolar farm5refused1.9
Lancarrwind farm6.9application withdrawn2.1
Brownrigg Hall Wind Farmwind farm11.5refused2.5
West Farm, Aspatriabattery storage50approved, not built2.9
Threapland Leeswind farm12application withdrawn6.0
Park Head Farmwind farm7.8refused7.2

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.7879, -3.3467).