Threapland Lees (12 MW wind farm)

Threapland Lees is a 12 MW wind farm project in Cumberland, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 7 September 2010; the record was last updated on 24 October 2011.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

12 MWwind farm
application withdrawnstatus in REPD
24 October 2011record last updated
Cumberlandcouncil area

Planning timeline

DateStage
30 October 2009Application submitted
7 September 2010Application withdrawn

Project details

Technology
wind farm
Capacity
12 MW
Status (REPD)
application withdrawn
Record last updated
24 October 2011
Operator or applicant
BT
Planning authority
Cumberland
Planning application reference
2/2009/0788
Turbines
4
Address (REPD)
Bothel, Cumbria
Council area (by location)
Cumberland
REPD reference
3463

Who decides

ApplicationsCumberlandUK
Decided applications (solar, wind, battery)9110,236
Refused30 (33%)19%
Solar refused4 of 3212%
Onshore wind refused25 of 4545%
Battery storage refused1 of 1416%
Median time from submission to decision22.4 weeks17.0 weeks
Appeals lodged / allowed7 / 9—

Other large projects within 10 km

ProjectTypeMWStatuskm
Wharrels Hillsolar farm14.6appeal withdrawn2.1
Wharrels Hill Wind Farmwind farm10.4operational2.7
West Farm, Aspatriabattery storage50approved, not built3.3
Aspatriasolar farm19operational4.4
Warwick Hallwind farm12refused4.8
Lancarrwind farm6.9application withdrawn4.9
Tallentire Hillwind farm12operational5.1
Westnewtonwind farm6.2operational5.2
Westnewton (withdrawn)wind farm10application withdrawn6.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.74, -3.304).