Bilbo Solar Farm Energy Storage (40 MW)

Bilbo Solar Farm Energy Storage is a 40 MW battery storage project in Aberdeenshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: under construction since 1 January 2024; the record was last updated on 3 February 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

40 MWbattery storage
under constructionstatus in REPD
3 February 2025record last updated
Aberdeenshirecouncil area

Planning timeline

DateStage
26 June 2019Application submitted
18 October 2019Planning permission granted
1 January 2024Construction started

Project details

Technology
battery storage (co-located with re)
Capacity
40 MW
Status (REPD)
under construction
Record last updated
3 February 2025
Operator or applicant
Green Energy International
Planning authority
Aberdeenshire
Planning application reference
APP/2019/0296
Address (REPD)
Land At Bilbo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian
Council area (by location)
Aberdeenshire
Time to decision
16 weeks
REPD reference
7020

Recorded together with Bilbo Solar Farm (36.6 MW solar farm, under construction).

Who decides

ApplicationsAberdeenshireUK
Decided applications (solar, wind, battery)20010,236
Refused64 (32%)19%
Solar refused1 of 4012%
Onshore wind refused60 of 13245%
Battery storage refused3 of 2816%
Median time from submission to decision40.6 weeks17.0 weeks
Appeals lodged / allowed15 / 13—

Other large projects within 10 km

ProjectTypeMWStatuskm
Greenside Extensionwind farm7approved, not built0.7
Land at Overside and Greenwellheads Farmswind farm9.2operational1.1
Frodo Solar and Battery Energy Developmentsolar farm60.1approved, not built1.3
South of Greenwellheadssolar farm5abandoned1.3
St Fergus Moss Wind Farmwind farm6operational2.2
St Fergus Renewable Energy Parksolar farm5under construction4.7
Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facilitysolar farm50approved, not built5.1
Strichen Southbattery storage10abandoned7.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (57.5914, -1.9045).