Castletown Wind Farm (9.6 MW)

Castletown Wind Farm is a 9.6 MW wind farm project in Highland, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 12 December 2024, no decision recorded; the record was last updated on 17 January 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

9.6 MWwind farm
application submittedstatus in REPD
17 January 2025record last updated
Highlandcouncil area

Planning timeline

DateStage
12 December 2024Application submitted

Project details

Technology
wind farm
Capacity
9.6 MW
Status (REPD)
application submitted
Record last updated
17 January 2025
Operator or applicant
Wind 2 Limited
Planning authority
Highland
Planning application reference
24/04932/FUL
Turbines
2
Turbine height
150 m
Address (REPD)
975M se/o Mains Of Durran Castletown
Council area (by location)
Highland
Name in REPD
Castletown - Wind Farm
REPD reference
10846

The scheme also includes 12 MW of battery storage, recorded separately in REPD (application submitted).

Who decides

ApplicationsHighlandUK
Decided applications (solar, wind, battery)16010,236
Refused68 (42%)19%
Solar refused0 of 1512%
Onshore wind refused61 of 11445%
Battery storage refused7 of 3116%
Median time from submission to decision52.3 weeks17.0 weeks
Appeals lodged / allowed20 / 20—

Other large projects within 10 km

ProjectTypeMWStatuskm
Durran Mainswind farm19.5refused1.8
Spittal Hillwind farm21refused on appeal7.0
Lyth Wind Farmwind farm24refused on appeal7.6
Lochend Holding, Barrock Wind Farmbattery storage10application submitted8.1
Lochend Holding, Barrock Wind Farmwind farm21application submitted8.1
Lochend Wind Farmwind farm9.2operational8.1
Slickly Wind Farmwind farm49.9approved, not built8.5
Watten Wind Farmwind farm47.6application withdrawn8.6
Stainland Energy Storage Projectbattery storage49.9approved, not built8.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (58.5425, -3.3599).