Dunwan Dam, Eaglesham Wind Farm (30 MW)
Dunwan Dam, Eaglesham Wind Farm is a 30 MW wind farm project in East Renfrewshire, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 15 August 2025, no decision recorded; the record was last updated on 26 September 2025.
30 MWwind farm
application submittedstatus in REPD
26 September 2025record last updated
East Renfrewshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 15 August 2025 | Application submitted |
Project details
- Technology
- wind farm
- Capacity
- 30 MW
- Status (REPD)
- application submitted
- Record last updated
- 26 September 2025
- Operator or applicant
- Green Cat Renewables
- Planning authority
- Glasgow City
- Planning application reference
- 2025/0439/TP
- Turbines
- 5
- Turbine height
- 200 m
- Address (REPD)
- Dunwan Dam, Eaglesham
- Council area (by location)
- East Renfrewshire
- Name in REPD
- Dunwan Dam, Eaglesham - Wind Farm
- REPD reference
- 16714
Who decides
| Applications | Glasgow City | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 23 | 10,236 |
| Refused | 0 (0%) | 19% |
| Solar refused | 0 of 19 | 12% |
| Onshore wind refused | 0 of 1 | 45% |
| Battery storage refused | 0 of 3 | 16% |
| Median time from submission to decision | 13.4 weeks | 17.0 weeks |
| Appeals lodged / allowed | 0 / 0 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Glasgow Road, Eaglesham | battery storage | 40 | approved, not built | 1.2 |
| Over Enoch Farm | wind farm | 6.5 | abandoned | 2.0 |
| Ardoch and Over Enoch Wind Farm (Ardoch) | wind farm | 7.2 | operational | 2.6 |
| Bonnyton, Kirkton Moor Road | solar farm | 28 | approved, not built | 2.6 |
| Moorhouse (Eaglesham) | wind farm | 47.5 | refused on appeal | 3.2 |
| Loganswell Farm | wind farm | 16 | application withdrawn | 5.3 |
| Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage | solar farm | 40 | approved, not built | 5.4 |
| Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage | battery storage | 50 | approved, not built | 5.4 |
| Middleton Wind Farm | wind farm | 12 | operational | 5.8 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.7402, -4.2731).