Goosey Lodge Solar Farm (10.5 MW)

Goosey Lodge Solar Farm is a 10.5 MW solar farm project in Bedford, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 25 May 2023, not yet built; the record was last updated on 2 June 2023. REPD also records that the planning permission expired on 25 May 2026, so the project may not go ahead in this form. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

10.5 MWsolar farm
approved, not builtmay be out of datestatus in REPD
2 June 2023record last updated
Bedfordcouncil area

REPD also records that the planning permission expired on 25 May 2026, so the project may not go ahead in this form.

Planning timeline

DateStage
8 July 2022Application submitted
25 May 2023Planning permission granted
25 May 2026Permission expired

Project details

Technology
solar farm
Capacity
10.5 MW
Status (REPD)
approved, not built
Record last updated
2 June 2023
Operator or applicant
Wykes Engineering Limited Goosey Lodge
Planning authority
Bedford
Planning application reference
22/01520/MAF
Site area
10.6 ha
Address (REPD)
South & E/O Goosey Lodge Farm, Wymington Lane, Wymington, Rushden
Council area (by location)
Bedford
Time to decision
46 weeks
Name in REPD
Goosey Lodge - Solar Farm
REPD reference
11923

Who decides

ApplicationsBedfordUK
Decided applications (solar, wind, battery)5010,236
Refused17 (34%)19%
Solar refused3 of 3212%
Onshore wind refused4 of 445%
Battery storage refused10 of 1416%
Median time from submission to decision15.9 weeks17.0 weeks
Appeals lodged / allowed0 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Gooseys Lodge, Wymington Lane Solar Farmsolar farm10.4approved, not built0.2
Glebe Farm Solar Energy Parksolar farm15operational0.9
Airfield Farm (Podington)wind farm8.6operational3.1
Odell Glebe Solar Farmsolar farm16.8operational3.3
Chelveston Renewable Energy Parksolar farm21permission expired5.4
Land at Wood Roadsolar farm5refused5.5
Chelveston Renewable Energy Park Wind Farm (East Northamptonshire)wind farm12.5operational5.7
Quarry, Ditchford Lane Solar Farmsolar farm10approved, not built5.8
London Road, Irchester Solar Farmsolar farm26operational6.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.2607, -0.5872).