Marley Thatch Solar Farm (6.3 MW)

Marley Thatch Solar Farm is a 6.3 MW solar farm project in South Hams, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 31 March 2013; the record was last updated on 8 April 2013.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6.3 MWsolar farm
operationalstatus in REPD
8 April 2013record last updated
South Hamscouncil area

Planning timeline

DateStage
29 March 2012Application submitted
28 June 2012Planning permission granted
28 January 2013Construction started
31 March 2013Operational

Project details

Technology
solar farm
Capacity
6.3 MW
Status (REPD)
operational
Record last updated
8 April 2013
Operator or applicant
TGC Renewables
Planning authority
South Hams
Planning application reference
39_45/0706/12/F
Address (REPD)
Marley Thatch Farm, South Brent
Council area (by location)
South Hams
Time to decision
13 weeks
REPD reference
1467

Who decides

ApplicationsSouth HamsUK
Decided applications (solar, wind, battery)3610,236
Refused6 (17%)19%
Solar refused3 of 2812%
Onshore wind refused3 of 345%
Battery storage refused0 of 516%
Median time from submission to decision13.1 weeks17.0 weeks
Appeals lodged / allowed1 / 2—

Other large projects within 10 km

ProjectTypeMWStatuskm
Hatchlands Farmsolar farm5.2operational1.7
Hazard Farmsolar farm6.4operational3.5
Coombeshead Solar Farmsolar farm8operational5.3
Lower Blakemore Farmsolar farm5refused on appeal5.3
Bidwell Solar Farmsolar farm5operational5.7
Hood Barton, Stavertonbattery storage99application submitted6.9
Riverford Farmbattery storage49.9permission expired6.9
Parkview solar parksolar farm6.5operational9.8
Halwell Airfieldsolar5.7refused9.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (50.4248, -3.8093).