Nunn Wood (24 MW wind farm)
Nunn Wood is a 24 MW wind farm project in Milton Keynes, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 8 October 2013; the record was last updated on 8 October 2013.
24 MWwind farm
application withdrawnstatus in REPD
8 October 2013record last updated
Milton Keynescouncil area
Planning timeline
| Date | Stage |
|---|---|
| 8 October 2013 | Application withdrawn |
Project details
- Technology
- wind farm
- Capacity
- 24 MW
- Status (REPD)
- application withdrawn
- Record last updated
- 8 October 2013
- Operator or applicant
- Npower Renewables
- Planning authority
- Milton Keynes
- Planning application reference
- WP/2006/0474/FM
- Turbines
- 12
- Address (REPD)
- Wind Farm Between Harrold Road and London Road Harrold Road, Bozea, Wellingborough
- Council area (by location)
- Milton Keynes
- REPD reference
- 2962
Who decides
| Applications | Milton Keynes | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 77 | 10,236 |
| Refused | 10 (13%) | 19% |
| Solar refused | 4 of 49 | 12% |
| Onshore wind refused | 1 of 2 | 45% |
| Battery storage refused | 5 of 26 | 16% |
| Median time from submission to decision | 7.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 0 / 0 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Hyde Farm | solar farm | 5 | operational | 2.3 |
| Nun Wood (Milton Keynes) | wind farm | 9 | refused on appeal | 3.2 |
| Nun Wood (Wellingborough) | wind farm | 9 | refused on appeal | 3.4 |
| Nun Wood (Bedford) | wind farm | 18 | refused on appeal | 3.8 |
| Land at Wood Road | solar farm | 5 | refused | 5.0 |
| Grendon Storage | battery storage | 49.9 | permission expired | 6.0 |
| Rectory Farm/Emberton | solar farm | 9 | operational | 6.0 |
| Milton Keynes Wind Farm | wind farm | 14 | operational | 6.4 |
| Grendon Lakes, Grendon | battery storage | 50 | approved, not built | 6.7 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.1903, -0.6775).