Nun Wood (Milton Keynes) (9 MW wind farm)
Nun Wood (Milton Keynes) is a 9 MW wind farm project in North Northamptonshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on appeal on 17 December 2013; the record was last updated on 31 January 2014.
9 MWwind farm
refused on appealstatus in REPD
31 January 2014record last updated
North Northamptonshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 23 January 2009 | Application submitted |
| 15 May 2009 | Refused by the planning authority |
| 17 December 2013 | Appeal refused |
Project details
- Technology
- wind farm
- Capacity
- 9 MW
- Status (REPD)
- refused on appeal
- Record last updated
- 31 January 2014
- Operator or applicant
- Npower Renewables
- Planning authority
- Bedford
- Planning application reference
- 08/02118/FULEIS
- Appeal reference
- 11/00011/NONDET
- Turbines
- 3
- Address (REPD)
- Land Between London Road And Harrold Road
- Council area (by location)
- North Northamptonshire
- Time to decision
- 16 weeks
- REPD reference
- 3771
Who decides
| Applications | Bedford | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 50 | 10,236 |
| Refused | 17 (34%) | 19% |
| Solar refused | 3 of 32 | 12% |
| Onshore wind refused | 4 of 4 | 45% |
| Battery storage refused | 10 of 14 | 16% |
| Median time from submission to decision | 15.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 0 / 1 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Nun Wood (Wellingborough) | wind farm | 9 | refused on appeal | 0.8 |
| Nun Wood (Bedford) | wind farm | 18 | refused on appeal | 2.1 |
| Land at Wood Road | solar farm | 5 | refused | 2.5 |
| Nunn Wood | wind farm | 24 | application withdrawn | 3.2 |
| Airfield Farm (Podington) | wind farm | 8.6 | operational | 3.8 |
| Odell Glebe Solar Farm | solar farm | 16.8 | operational | 4.3 |
| Grendon Storage | battery storage | 49.9 | permission expired | 4.9 |
| Hyde Farm | solar farm | 5 | operational | 5.5 |
| Grendon Lakes, Grendon | battery storage | 50 | approved, not built | 5.7 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.2151, -0.6533).