Strensham Wind Cluster (6 MW)
Strensham Wind Cluster is a 6 MW wind farm project in Tewkesbury, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 5 February 2013; the record was last updated on 23 August 2013.
6 MWwind farm
application withdrawnstatus in REPD
23 August 2013record last updated
Tewkesburycouncil area
Planning timeline
| Date | Stage |
|---|---|
| 4 April 2011 | Application submitted |
| 5 February 2013 | Application withdrawn |
Project details
- Technology
- wind farm
- Capacity
- 6 MW
- Status (REPD)
- application withdrawn
- Record last updated
- 23 August 2013
- Operator or applicant
- Wind Prospect Developments
- Planning authority
- Tewkesbury
- Planning application reference
- 09/01189/FUL
- Turbines
- 3
- Address (REPD)
- Brockeridge Common, Brockeridge, Twyning, Tewkesbury,
- Council area (by location)
- Tewkesbury
- REPD reference
- 3824
Earlier applications for this site
| Application | MW | Submitted | Outcome |
|---|---|---|---|
| Strensham Wind Cluster | 6 | 31 October 2008 | refused 6 May 2009 |
Who decides
| Applications | Tewkesbury | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 31 | 10,236 |
| Refused | 5 (16%) | 19% |
| Solar refused | 5 of 27 | 12% |
| Battery storage refused | 0 of 4 | 16% |
| Median time from submission to decision | 25.0 weeks | 17.0 weeks |
| Appeals lodged / allowed | 3 / 3 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Home Farm | solar farm | 25 | approved, not built | 0.9 |
| Home Farm | solar farm | 25 | approved, not built | 1.6 |
| Glebe Farm Solar Farm | solar farm | 32 | operational | 2.7 |
| Lower Strensham, Bourne Road (Extension) | solar farm | 8 | operational | 3.1 |
| Croome Airfield Solar Farm | solar farm | 49.9 | operational | 4.8 |
| Defford Aerodrome | solar farm | 49.9 | permission expired | 4.8 |
| Northway Lane Waste Transfer Station | battery storage | 7 | abandoned | 5.0 |
| Claydon Farm Solar Farm & Battery Storage | solar farm | 49.9 | approved, not built | 7.9 |
| Claydon Farm | solar farm | 18.2 | abandoned | 8.8 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.0449, -2.1515).