Unit 15, Borrowmeadow Road (19 MW battery storage)
Unit 15, Borrowmeadow Road is a 19 MW battery storage project in Stirling, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: abandoned; the record was last updated on 27 November 2019.
19 MWbattery storage
abandonedstatus in REPD
27 November 2019record last updated
Stirlingcouncil area
Planning timeline
| Date | Stage |
|---|---|
| 22 August 2017 | Application submitted |
Project details
- Technology
- battery storage (stand-alone storage)
- Capacity
- 19 MW
- Status (REPD)
- abandoned
- Record last updated
- 27 November 2019
- Operator or applicant
- Flexible Grid Power
- Planning authority
- Stirling
- Planning application reference
- 17/00665/FUL
- Address (REPD)
- Unit 15, Land adj and Rear Of Units @, Borrowmeadow Road, Stirling, Central
- Council area (by location)
- Stirling
- REPD reference
- 7144
Who decides
| Applications | Stirling | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 23 | 10,236 |
| Refused | 7 (30%) | 19% |
| Solar refused | 0 of 7 | 12% |
| Onshore wind refused | 6 of 11 | 45% |
| Battery storage refused | 1 of 5 | 16% |
| Median time from submission to decision | 30.1 weeks | 17.0 weeks |
| Appeals lodged / allowed | 1 / 2 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Easter Cringate Cottage, Polmaise Road | wind farm | 30 | application submitted | 1.4 |
| Shelloch Wind Farm | wind farm | 24 | approved, not built | 2.3 |
| Farm at Lower Polmaise | solar farm | 5 | permission expired | 2.3 |
| Manor Powis | solar farm | 5 | application withdrawn | 2.4 |
| Earlsburn Wind Farm Extension | wind farm | 34 | approved, not built | 2.8 |
| Glenside Farm | battery storage | 400 | approved, not built | 7.6 |
| Devilla Energy Storage Facility | battery storage | 500 | under construction | 8.3 |
| Windburn Wind Farm | wind farm | 65 | application submitted | 8.7 |
| Rullie Community Windfarm | wind farm | 25 | application withdrawn | 8.8 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (56.1175, -3.9141).