Winterton Road, Roxby Solar Farm (50 MW)

Winterton Road, Roxby Solar Farm is a 50 MW solar farm project in North Lincolnshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 8 February 2024, no decision recorded; the record was last updated on 28 February 2024. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

50 MWsolar farm
application submittedmay be out of datestatus in REPD
28 February 2024record last updated
North Lincolnshirecouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
8 February 2024Application submitted

Project details

Technology
solar farm
Capacity
50 MW
Status (REPD)
application submitted
Record last updated
28 February 2024
Operator or applicant
Solar 2 Limited
Planning authority
North Lincolnshire
Planning application reference
PA/2024/129
Site area
51.0 ha
Address (REPD)
W/O Winterton Road, Roxby, Scunthorpe
Council area (by location)
North Lincolnshire
Name in REPD
Winterton Road, Roxby - Solar Farm
REPD reference
12162

Who decides

ApplicationsNorth LincolnshireUK
Decided applications (solar, wind, battery)4710,236
Refused15 (32%)19%
Solar refused7 of 3312%
Onshore wind refused8 of 1045%
Battery storage refused0 of 416%
Median time from submission to decision10.0 weeks17.0 weeks
Appeals lodged / allowed6 / 4—

Other large projects within 10 km

ProjectTypeMWStatuskm
Ironstone Quarry Wind Farmwind farm7.5refused2.9
Bagmoorwind farm16operational3.6
Carr Lane Solar Farmsolar farm9approved, not built3.7
Winterton Landfill Site - Ground Mounted Solar PV Arrayssolar farm5under construction4.2
Winterton Roadbattery storage95approved, not built5.0
Grangewind farm12.3operational5.5
North Wharf Solar Farmsolar farm6refused on appeal5.6
Flixborough Industrial Estatesolar farm5operational5.6
North Lincolnshire Green Energy Parkbattery storage30approved, not built6.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.6393, -0.6167).