Solar, wind and battery projects near Liverpool (L14)
79 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of L14 (Liverpool): 9 are waiting for a planning decision, 58 approved but not yet running, 5 operational. The largest live scheme is Perimeter Road, Kirkby (165 MW battery storage, application submitted on 14 November 2025, no decision recorded), 7.5 km away. Offshore, 3 wind farms are recorded within 40 km; the nearest is Burbo Bank (90 MW, operational), 21.6 km away. Source: Renewable Energy Planning Database, July 2026 extract.
Projects within 10 km of L14
Projects of 1 MW and more (20)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated | Council | km |
|---|---|---|---|---|---|---|---|---|
| Battery Energy Storage Systembattery storage | battery storage | 6 | approved, not builtupdated May 2025 | Nov 2024 | granted Apr 2025 | May 2025 | Liverpool | 2.6 |
| Lister Drivebattery storage | battery storage | 49.9 | operationalupdated Jan 2023 | Feb 2020 | granted Mar 2021 | Jan 2023 | Liverpool | 3.1 |
| Liverpool Energy Management Facilitybattery storage | battery storage | 49.9 | operationalupdated Mar 2022 | Feb 2020 | granted Nov 2020 | Mar 2022 | Liverpool | 3.1 |
| Carnegie Road (Phase 2)battery storage | battery storage | 40 | permission expiredupdated Jun 2019 | Mar 2019 | granted Dec 2019 | Jun 2019 | Liverpool | 3.1 |
| Land at Carnegie Roadbattery storage | battery storage | 20 | operationalupdated Jan 2019 | Nov 2016 | — | Jan 2019 | Liverpool | 3.1 |
| Larkins Farm, Gellings Lane Solar Farmsolar farm | solar farm | 1.5 | refusedupdated Aug 2024 | Oct 2023 | refused Jul 2024 | Aug 2024 | Knowsley | 4.9 |
| D H L Exel Supply Chain Burton Foods, Portal Wayrooftop solar | rooftop solar | 1 | application submitted may be out of dateupdated Jul 2023 | Jun 2023 | — | Jul 2023 | Liverpool | 5.2 |
| Coopers Lane, Kirkbybattery storage | battery storage | 49.5 | approved, not builtupdated May 2024 | Jul 2023 | granted Apr 2024 | May 2024 | Knowsley | 5.9 |
| Cut Lanebattery storage | battery storage | 57 | application submittedupdated Jun 2025 | Apr 2025 | — | Jun 2025 | Knowsley | 6.5 |
| Charleywood Road, Knowsley Industrial Parkbattery storage | battery storage | 49.9 | abandonedupdated Sep 2022 | Oct 2017 | — | Sep 2022 | Knowsley | 6.8 |
| Perimeter Road, Kirkbybattery storage | battery storage | 165 | application submittedupdated Dec 2025 | Nov 2025 | — | Dec 2025 | Knowsley | 7.5 |
| Jaguar Land Rover Jaguar Plant, North Roadrooftop solar | rooftop solar | 9.3 | approved, not builtupdated Mar 2025 | Dec 2024 | granted Feb 2025 | Mar 2025 | Knowsley | 8.1 |
| Ford Halewood Transmissions Spekere, Boulevardsolar farm | solar farm | 1.3 | approved, not builtupdated Dec 2023 | Jul 2023 | granted Dec 2023 | Dec 2023 | Knowsley | 8.1 |
| Hawthorne Roadbattery storage | battery storage | 20 | under constructionupdated Sep 2020 | Jan 2020 | granted Mar 2022 | Sep 2020 | Sefton | 8.4 |
| Huskisson Dock Building, Huskisson Dockrooftop solar | rooftop solar | 1.5 | approved, not builtupdated Apr 2024 | Jan 2024 | granted Mar 2024 | Apr 2024 | Liverpool | 8.5 |
| Port of Liverpool windwind farm | wind farm | 10 | operationalupdated Jun 2010 | Aug 2005 | granted Dec 2005 | Jun 2010 | Sefton | 8.9 |
| Sutton Manorbattery storage | battery storage | 57 | approved, not built may be out of dateupdated Jun 2022 | Jun 2022 | granted Sep 2022 | Jun 2022 | St. Helens | 9.4 |
| Liverpool John Lennon Airport Solar Farmsolar farm | solar farm | 3 | refusedupdated Jan 2022 | Dec 2021 | refused Jun 2022 | Jan 2022 | Liverpool | 9.6 |
| Biffa Electricity Generating Compound, Burtonhead Roadbattery storage | battery storage | 1 | approved, not built may be out of dateupdated Nov 2022 | Aug 2022 | granted Oct 2022 | Nov 2022 | St. Helens | 9.7 |
| Burtonhead Roadbattery storage | battery storage | 30 | abandonedupdated Feb 2019 | Oct 2017 | — | Feb 2019 | St. Helens | 9.9 |
Smaller schemes under 1 MW, mostly rooftop solar (59)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated | Council | km |
|---|---|---|---|---|---|---|---|---|
| Sainsburys Supermarket, East Prescot Roadrooftop solar | rooftop solar | 0.5 | approved, not builtupdated Jul 2025 | May 2025 | granted Jun 2025 | Jul 2025 | Liverpool | 1.2 |
| Alder Hey Hospital, East Prescot Roadrooftop solar | rooftop solar | 0.5 | approved, not builtupdated Jun 2026 | Jan 2026 | granted Mar 2026 | Jun 2026 | Liverpool | 1.2 |
| The Big Yellow Self Storage, Mill Lanerooftop solar | rooftop solar | 0.2 | approved, not builtupdated May 2023 | Apr 2023 | granted May 2023 | May 2023 | Liverpool | 2.4 |
| Stanley Meat Market, Prescot Road Solar PV Systemsrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Sep 2024 | Jul 2024 | granted Jul 2024 | Sep 2024 | Liverpool | 3.0 |
| Dixons Croxteth Academy, Carr Lane Eastrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Nov 2025 | Jul 2025 | granted Oct 2025 | Nov 2025 | Liverpool | 3.7 |
| Earlsfield Park, Arley Driverooftop solar | rooftop solar | 0.1 | application submittedupdated Feb 2025 | Jan 2025 | — | Feb 2025 | Knowsley | 3.8 |
| Peter Gilding And Company, Caddick Roadrooftop solar | rooftop solar | 0.5 | approved, not builtupdated Dec 2024 | Oct 2024 | granted Dec 2024 | Dec 2024 | Knowsley | 4.6 |
| Adlib House, Kitling Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Oct 2023 | Aug 2023 | granted Sep 2023 | Oct 2023 | Knowsley | 4.9 |
| Penrhyn Court, Penrhyn Roadrooftop solar | rooftop solar | 0.3 | approved, not builtupdated May 2026 | Jan 2026 | granted Feb 2026 | May 2026 | Knowsley | 5.2 |
| Beverston Engineering, Unit Brooftop solar | rooftop solar | 0.2 | approved, not builtupdated Nov 2025 | Jul 2025 | granted Sep 2025 | Nov 2025 | Knowsley | 5.2 |
| Jeffrey Humble Playing Fields, Long Lane - Micro Energy Storage Systembattery storage | battery storage | 0.2 | approved, not builtupdated Nov 2025 | Aug 2025 | granted Sep 2025 | Nov 2025 | Liverpool | 5.4 |
| North Liverpool Academy, Heyworth Streetrooftop solar | rooftop solar | 0.2 | application submittedupdated Aug 2025 | Jul 2025 | — | Aug 2025 | Liverpool | 5.9 |
| Knowsley Industrial Parkrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Apr 2022 | Nov 2020 | granted Jan 2021 | Apr 2022 | Knowsley | 6.1 |
| Leisure United Simpson - Micro Energy Storage Systembattery storage | battery storage | 0.2 | approved, not builtupdated Nov 2025 | Jul 2025 | granted Sep 2025 | Nov 2025 | Liverpool | 6.2 |
| Whiston Hospital, Warrington Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Apr 2026 | Oct 2025 | granted Dec 2025 | Apr 2026 | Knowsley | 6.3 |
| Sainsburys, Jennifer Avenuerooftop solar | rooftop solar | 0.5 | approved, not builtupdated Aug 2023 | Jul 2023 | granted Aug 2023 | Aug 2023 | Liverpool | 6.6 |
| Leisure United Jericho Lane - Micro Energy Storage Systembattery storage | battery storage | 0.2 | approved, not builtupdated Nov 2025 | Jul 2025 | granted Aug 2025 | Nov 2025 | Liverpool | 6.6 |
| Aigburth Parkrooftop solar | rooftop solar | — | approved, not builtupdated Apr 2021 | Feb 2021 | granted May 2021 | Apr 2021 | Liverpool | 6.6 |
| Tesco Superstorerooftop solar | rooftop solar | — | approved, not builtupdated Mar 2021 | Jan 2021 | granted Apr 2021 | Mar 2021 | Liverpool | 6.7 |
| Charley Wood Road, Knowsley Industrial Park Solar Photovoltaicsrooftop solar | rooftop solar | 0.9 | approved, not builtupdated Oct 2023 | Sep 2023 | granted Oct 2023 | Oct 2023 | Knowsley | 6.8 |
| Henry Diaper, Knowsley Industrial Parkrooftop solar | rooftop solar | 0.2 | application submitted may be out of dateupdated May 2023 | May 2023 | — | May 2023 | Knowsley | 7.0 |
| David Lloyd Leisure, Arbour Lanerooftop solar | rooftop solar | — | approved, not builtupdated Aug 2023 | Jun 2023 | granted Aug 2023 | Aug 2023 | Knowsley | 7.1 |
| Self Storage Liverpool South, Goodlass Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jul 2025 | Apr 2025 | granted Jun 2025 | Jul 2025 | Liverpool | 7.2 |
| Halewood Leisure Centre, Baileys Lanerooftop solar | rooftop solar | 0.3 | approved, not builtupdated Dec 2024 | Oct 2024 | granted Nov 2024 | Dec 2024 | Knowsley | 7.2 |
| Halewood Leisure Centre, Baileys Lanerooftop solar | rooftop solar | 0.3 | approved, not builtupdated Sep 2024 | Jul 2024 | granted Aug 2024 | Sep 2024 | Knowsley | 7.2 |
| HMS Eaglet, Sefton Street Wind Turbine & Solar Panelsrooftop solar | rooftop solar | — | application submitted may be out of dateupdated Sep 2022 | Sep 2022 | — | Sep 2022 | Liverpool | 7.5 |
| HMS Eaglet, Sefton Street Wind Turbine & Solar Panelswind turbine | wind turbine | — | application submitted may be out of dateupdated Sep 2022 | Sep 2022 | — | Sep 2022 | Liverpool | 7.5 |
| Mercedes-Benz, Pall Mallrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Jul 2022 | Jun 2022 | granted Aug 2022 | Jul 2022 | Liverpool | 7.5 |
| Port Of Liverpool Building, Mann Islandrooftop solar | rooftop solar | — | approved, not builtupdated Jan 2026 | Dec 2025 | granted Feb 2026 | Jan 2026 | Liverpool | 7.7 |
| IBL Cold Stores Solar Photovoltaics Panelsrooftop solar | rooftop solar | 0.8 | operationalupdated Oct 2021 | Oct 2021 | granted Feb 2022 | Oct 2021 | Knowsley | 7.9 |
| Renaissance Way - Plot 7 Solar PV Arrayrooftop solar | rooftop solar | — | approved, not builtupdated Jan 2024 | Oct 2023 | granted Dec 2023 | Jan 2024 | Liverpool | 8.0 |
| Steel Terminal, Royal Seaforth Dockrooftop solar | rooftop solar | — | approved, not builtupdated Mar 2024 | Jan 2024 | granted Mar 2024 | Mar 2024 | Liverpool | 8.0 |
| Moss End Way, Kirkby Knowsleybattery storage | battery storage | 0.2 | refusedupdated Jun 2026 | Dec 2025 | refused Apr 2026 | Jun 2026 | Knowsley | 8.0 |
| Waste Care, Lower Bank Viewrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Mar 2025 | Dec 2024 | granted Feb 2025 | Mar 2025 | Liverpool | 8.1 |
| Jaguar Land Rover, North Road - Ground Mounted Solar Panelssolar farm | solar farm | — | approved, not builtupdated Mar 2025 | Jan 2025 | granted Mar 2025 | Mar 2025 | Knowsley | 8.1 |
| SCS Lighting & Renewables, Aintreerooftop solar | rooftop solar | 0.3 | application submitted may be out of dateupdated Jun 2022 | Jun 2022 | — | Jun 2022 | Sefton | 8.1 |
| Bulk Powder Terminals, Regent Roadrooftop solar | rooftop solar | 0.7 | approved, not builtupdated Mar 2024 | Jan 2024 | granted Feb 2024 | Mar 2024 | Liverpool | 8.2 |
| Estuary Boulevardrooftop solar | rooftop solar | 0.6 | approved, not builtupdated Apr 2024 | Jan 2024 | granted Mar 2024 | Apr 2024 | Liverpool | 8.4 |
| Speke Hall Avenuebattery storage | battery storage | — | approved, not builtupdated Mar 2025 | Dec 2023 | granted Feb 2025 | Mar 2025 | Liverpool | 8.5 |
| Multiuser 5 Building, Royal Seaforth Dockrooftop solar | rooftop solar | — | approved, not builtupdated Mar 2024 | Jan 2024 | granted Mar 2024 | Mar 2024 | Sefton | 8.6 |
| Garston Shore Roadrooftop solar | rooftop solar | 0.5 | approved, not built may be out of dateupdated Aug 2022 | Jun 2022 | granted Sep 2022 | Aug 2022 | Liverpool | 8.7 |
| Heysham Box, Leckwith Roadbattery storage | battery storage | 0.2 | approved, not built may be out of dateupdated Nov 2022 | Sep 2022 | granted Nov 2022 | Nov 2022 | Sefton | 8.8 |
| Heysham Box, Leckwith Roadbattery storage | battery storage | 0.2 | approved, not builtupdated Mar 2025 | Jan 2025 | granted Mar 2025 | Mar 2025 | Sefton | 8.8 |
| Royal Seaforth Dock, New Jenkins Shedsrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Mar 2024 | Jan 2024 | granted Feb 2024 | Mar 2024 | Sefton | 8.9 |
| Multiuser 4 Buildingrooftop solar | rooftop solar | — | approved, not builtupdated Mar 2024 | Jan 2024 | granted Feb 2024 | Mar 2024 | Sefton | 8.9 |
| Multiuser 1 Building, Regent Roadrooftop solar | rooftop solar | — | approved, not builtupdated Mar 2024 | Jan 2024 | granted Feb 2024 | Mar 2024 | Sefton | 8.9 |
| Temp Control Buildingrooftop solar | rooftop solar | — | approved, not builtupdated Mar 2024 | Jan 2024 | granted Mar 2024 | Mar 2024 | Sefton | 8.9 |
| Peel Road Energy Centrebattery storage | battery storage | — | permission expiredupdated Apr 2020 | Sep 2017 | granted Jun 2018 | Apr 2020 | Sefton | 9.0 |
| Multiuser 2 Building, Regent Roadrooftop solar | rooftop solar | — | approved, not builtupdated Mar 2024 | Jan 2024 | granted Feb 2024 | Mar 2024 | Sefton | 9.1 |
| Royal Seaforth Dockrooftop solar | rooftop solar | — | approved, not builtupdated Mar 2024 | Jan 2024 | granted Feb 2024 | Mar 2024 | Sefton | 9.2 |
| Lea Green Business Park, Eurolinkrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Aug 2025 | May 2025 | granted Jul 2025 | Aug 2025 | St. Helens | 9.2 |
| Lea Green Business Park, Eurolinkrooftop solar | rooftop solar | 0.6 | approved, not builtupdated Jul 2024 | May 2024 | granted Jun 2024 | Jul 2024 | St. Helens | 9.2 |
| Tipographic, Morpeth Wharfrooftop solar | rooftop solar | 0.8 | approved, not builtupdated May 2023 | Mar 2023 | granted May 2023 | May 2023 | Wirral | 9.3 |
| Mere Grange, Leasiderooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jun 2025 | Apr 2025 | granted Jun 2025 | Jun 2025 | St. Helens | 9.3 |
| Queens Park Health And Fitnessrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Feb 2025 | Dec 2024 | granted Feb 2025 | Feb 2025 | St. Helens | 9.6 |
| Stopgate Lane, Simonswoodrooftop solar | rooftop solar | 0.7 | approved, not builtupdated Oct 2022 | Aug 2022 | granted Oct 2022 | Oct 2022 | West Lancashire | 9.6 |
| Cwt Maintenance Building, Regent Roadrooftop solar | rooftop solar | — | approved, not builtupdated Mar 2024 | Jan 2024 | granted Feb 2024 | Mar 2024 | Sefton | 9.6 |
| Litherland High School, Sterrix Lanerooftop solar | rooftop solar | 0.1 | approved, not builtupdated Sep 2025 | Jul 2025 | granted Sep 2025 | Sep 2025 | Sefton | 9.7 |
| The Sutton Academy, Elton Head Roadrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Sep 2025 | Jul 2025 | granted Sep 2025 | Sep 2025 | St. Helens | 9.9 |
Distance from the average position of the L14 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.
By type
| Type | All | Pending | Approved | Operational | Refused | MW in pipeline |
|---|---|---|---|---|---|---|
| Solar farm | 4 | 0 | 2 | 0 | 2 | 1.3 |
| Rooftop solar | 52 | 6 | 45 | 1 | 0 | 24.3 |
| Wind farm | 1 | 0 | 0 | 1 | 0 | 0 |
| Wind turbine | 1 | 1 | 0 | 0 | 0 | 0 |
| Battery storage | 21 | 2 | 11 | 3 | 1 | 356 |
MW in pipeline: pending, approved and under-construction capacity.
Offshore wind farms within 40 km
| Wind farm | MW | Status (REPD) | km |
|---|---|---|---|
| Burbo Bank | 90 | operationalupdated Feb 2018 | 21.6 |
| Burbo Bank Extension (Burbo Bank 2) | 258 | operationalupdated May 2018 | 26.7 |
| North Hoyle | 60 | operationalupdated Aug 2017 | 37.6 |
Operational, approved and pending offshore wind farms; distance from the district centre to the REPD grid reference of each wind farm (one point per site, so the nearest turbines can be closer or further). All offshore wind farms in UK waters.
How Liverpool decides solar, wind and battery applications
| Applications | Liverpool | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 26 | 10,236 |
| Refused | 0 (0%) | 19% |
| Solar refused | 0 of 18 | 12% |
| Battery storage refused | 0 of 8 | 16% |
| Median time from submission to decision | 7.8 weeks | 17.0 weeks |
| Appeals lodged / allowed | 0 / 0 | — |
Is the status up to date?
32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near L14, 9 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.