Energy Projects Near You

Solar, wind and battery projects near Washington (NE38)

72 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of NE38 (Sunderland): 4 are waiting for a planning decision, 54 approved but not yet running, 9 operational. The largest live scheme is West Boldon Substation (60 MW battery storage, approved on 10 December 2024, not yet built), 6.3 km away. Offshore, 3 wind farms are recorded within 40 km; the nearest is Blyth Offshore Wind Test Site (41.5 MW, operational), 32.1 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

72projects within 10 km
4awaiting a decision
54approved, not running
9operational

Projects within 10 km of NE38

Projects of 1 MW and more (25)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Rolls Royce Plc, Radial Park Roadrooftop solarrooftop solar1.6approved, not builtupdated Jan 2025Oct 2024granted Dec 2024Jan 2025Sunderland2.0
Snop, Rainhill Roadrooftop solarrooftop solar1.2approved, not built may be out of dateupdated May 2024Dec 2022granted Jan 2023May 2024Sunderland3.0
Komatsu UK, Durham Roadrooftop solarrooftop solar1.8approved, not builtupdated Feb 2025Oct 2024granted Dec 2024Feb 2025Gateshead3.5
Nissan Wind Farmwind farmwind farm4operationalupdated Oct 2009Oct 2004granted Aug 2005Oct 2009Sunderland3.6
Nissan Motors Plant Extnwind farmwind farm2operationalupdated Nov 2013Jun 2007granted Jul 2007Nov 2013Sunderland3.6
Usworth House Farm, Peareth Hall Road Solar Farmsolar farmsolar farm27.3refusedupdated Dec 2025Jan 2023refused Oct 2025Dec 2025Sunderland3.7
Unipres buildingrooftop solarrooftop solar4.9operationalupdated Mar 2023Dec 2018granted Feb 2019Mar 2023Sunderland3.7
Nissan Wind Farm Extensionwind farmwind farm4.3application withdrawnupdated Dec 2017Dec 2015—Dec 2017Sunderland3.9
Mary Avenue, Birtleybattery storagebattery storage71refusedupdated Feb 2026Jun 2024refused Jan 2026Feb 2026Gateshead4.0
Woodhouse Farmsolar farmsolar farm11refusedupdated Jan 2015Oct 2014refused Jan 2015Jan 2015Sunderland4.2
Fox Cover Roadbattery storagebattery storage30approved, not builtupdated Oct 2024Sep 2023granted Sep 2024Oct 2024Sunderland4.3
Calsonic Kanseirooftop solarrooftop solar2.1approved, not builtupdated Jul 2024Apr 2024granted Jun 2024Jul 2024Sunderland4.5
SNOP UK, Washington Roadrooftop solarrooftop solar1.1approved, not builtupdated Feb 2026Jan 2026granted Mar 2026Feb 2026Sunderland4.5
Washington Road Solar Farmsolar farmsolar farm20approved, not built may be out of dateupdated Dec 2021Oct 2021granted Dec 2021Dec 2021Sunderland4.8
Nissan Test Tracksolar farmsolar farm4.8operationalupdated Jun 2016May 2015granted Jul 2015Jun 2016Sunderland4.8
NCL1, Follingsby Lanerooftop solarrooftop solar3.9approved, not built may be out of dateupdated Apr 2023Feb 2023granted Apr 2023Apr 2023Gateshead4.8
Hastings Hill Farm, Foxcover Roadbattery storagebattery storage38approved, not builtupdated Aug 2025Oct 2024granted Jul 2025Aug 2025Sunderland5.0
Lumley Water Treatment Workssolar farmsolar farm1.9operationalupdated Jan 2022Oct 2020granted Dec 2020Jan 2022County Durham6.1
West Boldon Substationbattery storagebattery storage60approved, not builtupdated Jul 2025Jul 2023granted Dec 2024Jul 2025South Tyneside6.3
Parker Hannifin Manufacturingrooftop solarrooftop solar1.1approved, not builtupdated Aug 2023Jun 2023granted Aug 2023Aug 2023Gateshead7.8
Albany Roadsolar farmsolar farm2approved, not built may be out of dateupdated Dec 2022Oct 2021granted Dec 2021Dec 2022Gateshead9.1
Great Eppleton Farm Repoweringwind farmwind farm8.2operationalupdated Jun 2011Mar 2007granted Aug 2007Jun 2011Sunderland9.6
Great Eppleton Wind Farmwind farmwind farm3operationalupdated Oct 2009Aug 1995granted Jul 1996Oct 2009Sunderland9.6
Salters Lanebattery storagebattery storage18application submittedupdated Aug 2025Jul 2025—Aug 2025County Durham9.7
South Sharpley Wind Farm (Revised)wind farmwind farm7.5operationalupdated Jan 2013May 2008granted Apr 2011Jan 2013County Durham9.8
Smaller schemes under 1 MW, mostly rooftop solar (47)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Washington Primary Care Centre, Parkwayrooftop solarrooftop solar0.2approved, not builtupdated Mar 2026Nov 2025granted Jan 2026Mar 2026Sunderland0.6
The Galleries, Washington Town Centrerooftop solarrooftop solar0.6approved, not builtupdated Jul 2026Apr 2026granted Jun 2026Jul 2026Sunderland0.9
Sedling Roadrooftop solarrooftop solar0.4approved, not builtupdated Mar 2022Feb 2022granted Apr 2022Mar 2022Sunderland1.0
The Cylinder Service Centre, Sedling Roadrooftop solarrooftop solar0.2approved, not builtupdated Sep 2025Jul 2025granted Sep 2025Sep 2025Sunderland1.0
Rocket Medical, Sedling Roadrooftop solarrooftop solar0.4approved, not builtupdated Feb 2023Dec 2022granted Feb 2023Feb 2023Sunderland1.3
Encore Envelopes Limited, Industrial Roadrooftop solarrooftop solar0.5approved, not builtupdated Dec 2023Oct 2023granted Dec 2023Dec 2023Sunderland1.9
Griffiths Textiles Machines, Alston Roadrooftop solarrooftop solar0.7approved, not builtupdated Oct 2022Aug 2022granted Sep 2022Oct 2022Sunderland2.2
Spire Roadrooftop solarrooftop solar0.2approved, not builtupdated Mar 2022Feb 2022granted Mar 2022Mar 2022Sunderland2.3
Vantec, Infiniti Driverooftop solarrooftop solar0.3approved, not builtupdated Jun 2023Apr 2023granted Jun 2023Jun 2023Sunderland2.4
Stephenson Industrial Estate, Rutherford Roadrooftop solarrooftop solar0.2approved, not builtupdated May 2026Jan 2026granted Mar 2026May 2026Sunderland3.1
Stephenson Road - Micro Energy Storagebattery storagebattery storage0.2approved, not builtupdated Apr 2025Feb 2025granted Mar 2025Apr 2025Sunderland3.6
Vantec, Turbine Wayrooftop solarrooftop solar0.3approved, not builtupdated Jun 2023Apr 2023granted Jun 2023Jun 2023Sunderland3.7
Birtley Building Productsrooftop solarrooftop solar0.6approved, not builtupdated Aug 2025Jun 2025granted Aug 2025Aug 2025Gateshead4.2
Marelli, Home Furniture Shoprooftop solarrooftop solar1application withdrawnupdated Sep 2023Jun 2023—Sep 2023Sunderland4.5
Faltec, International Driverooftop solarrooftop solar0.7approved, not builtupdated Jan 2025Oct 2024granted Nov 2024Jan 2025Sunderland4.8
AESC UK, Giga Factories, Plot 2 - Plant 3, Warehouse, Office & Sub-stationsbattery storagebattery storage—approved, not builtupdated May 2026Apr 2024granted Apr 2026May 2026South Tyneside5.0
Sedgeletch Sewage Treatment Workssolar farmsolar farm—under constructionupdated Oct 2022Nov 2020granted Jan 2021Oct 2022Sunderland5.0
Chester-Le-Street Community Hospitalrooftop solarrooftop solar0.2approved, not builtupdated Jan 2026Dec 2025granted Feb 2026Jan 2026County Durham5.7
Queen Elizabeth Avenue, Sheriff Hill Solar Arraysrooftop solarrooftop solar0.5approved, not builtupdated Mar 2022Feb 2022granted Apr 2022Mar 2022Gateshead6.1
Donwood Double Glazing, Stonehills Buildings - Unit A23 - Solar Panelsrooftop solarrooftop solar0.2approved, not builtupdated Mar 2025Jan 2025granted Mar 2025Mar 2025Gateshead6.8
Big Yellow Self Storagerooftop solarrooftop solar0.2approved, not builtupdated Jul 2025Apr 2025granted Jun 2025Jul 2025Gateshead7.1
Team Valley Trading Estate Solar Photovoltaic Equipmentrooftop solarrooftop solar0.2approved, not builtupdated Feb 2022Feb 2022granted Mar 2022Feb 2022Gateshead7.2
Evolve Business Centrerooftop solarrooftop solar0.3approved, not built may be out of dateupdated Oct 2023Feb 2020granted May 2020Oct 2023Sunderland7.4
Evolve Business Centrebattery storagebattery storage—approved, not built may be out of dateupdated Jan 2022Feb 2020granted May 2020Jan 2022Sunderland7.4
Clearly Drinks, Riverside Roadrooftop solarrooftop solar0.2approved, not builtupdated Mar 2025Jan 2025granted Mar 2025Mar 2025Sunderland7.4
Morrisons, Doxford Parkrooftop solarrooftop solar0.4approved, not builtupdated Jul 2025Mar 2025granted May 2025Jul 2025Sunderland7.5
Buzz Bingo, Pallion New Roadrooftop solarrooftop solar—application submittedMay 2026——Sunderland7.7
Dacon Fabrications Limited, Dukeswayrooftop solarrooftop solar0.2approved, not builtupdated Nov 2022Oct 2022granted Nov 2022Nov 2022Gateshead7.8
Robert Duncan Timber Limited, Green Lanerooftop solarrooftop solar0.2approved, not builtupdated Feb 2023Dec 2022granted Jan 2023Feb 2023Gateshead8.0
Unit 1, Walker Riverside, Wincomblee Road -Photovoltaic Panelsrooftop solarrooftop solar0.3approved, not builtupdated Feb 2025Dec 2024granted Jan 2025Feb 2025Newcastle upon Tyne8.0
Riverdale Paper, Earlswayrooftop solarrooftop solar0.2approved, not builtupdated Nov 2022Oct 2022granted Nov 2022Nov 2022Gateshead8.1
Neilson Roadsolar farmsolar farm0.9approved, not built may be out of dateupdated Feb 2022Oct 2021granted Dec 2021Feb 2022Gateshead8.3
University of Sunderlandrooftop solarrooftop solar0.2approved, not builtupdated Apr 2022Apr 2022granted Jun 2022Apr 2022Sunderland8.6
Hebburn Lakes Primary School, Campbell Park Roadrooftop solarrooftop solar0.2approved, not builtupdated Jan 2026Oct 2025granted Nov 2025Jan 2026South Tyneside8.8
Regent Streetsolar farmsolar farm—operationalupdated Nov 2023Jun 2021granted Sep 2021Nov 2023Gateshead8.9
Venerable Bede Church Of England Academyrooftop solarrooftop solar0.3approved, not builtupdated Jan 2026Oct 2025granted Oct 2025Jan 2026Sunderland8.9
Tyneview Primary School, Winslow Placerooftop solarrooftop solar0.2approved, not builtupdated Sep 2023Jul 2023granted Aug 2023Sep 2023Newcastle upon Tyne9.1
Saint Marys Car Park, Saint Marys Boulevardrooftop solarrooftop solar0.2approved, not built may be out of dateupdated Feb 2023Jan 2022granted Feb 2023Feb 2023Sunderland9.2
Saint Marys Car Park, Saint Marys Boulevardbattery storagebattery storage—approved, not built may be out of dateupdated Feb 2023Jan 2022granted Feb 2023Feb 2023Sunderland9.2
Hetton Commnity Pool/Wellness Centre, Welfare Roadrooftop solarrooftop solar0.2application submittedupdated Sep 2024Sep 2024—Sep 2024Sunderland9.2
Simonside Industrial Unit, Shaftesbury Avenuerooftop solarrooftop solar0.4approved, not builtupdated Oct 2024Sep 2024granted Oct 2024Oct 2024South Tyneside9.6
University Of Sunderland, Saint Peters Gaterooftop solarrooftop solar0.2approved, not builtupdated May 2026Feb 2026granted Apr 2026May 2026Sunderland9.6
Monkhouse And Brown, Team Streetrooftop solarrooftop solar0.2approved, not builtupdated Jul 2025Apr 2025granted Jun 2025Jul 2025Gateshead9.7
Walker Riverside Academy - Photovoltaic Panelsrooftop solarrooftop solar0.2approved, not builtupdated Jun 2021Apr 2021granted Jun 2021Jun 2021Newcastle upon Tyne9.8
Hadrian Square - Photovoltaic Panelsrooftop solarrooftop solar0.3approved, not builtupdated Oct 2021Aug 2021granted Sep 2021Oct 2021Newcastle upon Tyne9.9
University Of Sunderland Reg Vardy Centre, Liberty Wayrooftop solarrooftop solar0.7approved, not builtupdated Jul 2024Apr 2024granted Jun 2024Jul 2024Sunderland9.9
Sunderland City Council Independent Living Centrerooftop solarrooftop solar0.2application submittedupdated Nov 2024Sep 2024—Nov 2024Sunderland9.9

Distance from the average position of the NE38 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Solar farm9043222.9
Rooftop solar483431024.7
Wind farm600500
Battery storage91701146

MW in pipeline: pending, approved and under-construction capacity.

Offshore wind farms within 40 km

Wind farmMWStatus (REPD)km
Blyth Offshore Wind Test Site41.5operationalupdated Jul 201832.1
Blyth Offshore Wind Farm Phase 2 Demonstrator Project58.4approved, not builtupdated Apr 202232.1
Teesside Offshore Wind Farm62operationalupdated May 201539.0

Operational, approved and pending offshore wind farms; distance from the district centre to the REPD grid reference of each wind farm (one point per site, so the nearest turbines can be closer or further). All offshore wind farms in UK waters.

How Sunderland decides solar, wind and battery applications

ApplicationsSunderlandUK
Decided applications (solar, wind, battery)4010,236
Refused3 (8%)19%
Solar refused3 of 3112%
Onshore wind refused0 of 445%
Battery storage refused0 of 516%
Median time from submission to decision8.4 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

All projects in Sunderland

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near NE38, 9 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.