Solar, wind and battery projects near Rainham (RM13)
81 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of RM13 (Havering): 9 are waiting for a planning decision, 51 approved but not yet running, 14 operational. The largest live scheme is Manor Farm, Dartford Road (212 MW battery storage, application submitted on 5 June 2025, no decision recorded), 9.8 km away. Source: Renewable Energy Planning Database, July 2026 extract.
Projects within 10 km of RM13
Projects of 1 MW and more (29)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated | Council | km |
|---|---|---|---|---|---|---|---|---|
| Ford Motor Company Ltd (Extension)wind turbine | wind turbine | 2 | operationalupdated Sep 2011 | Apr 2009 | granted Jul 2009 | Sep 2011 | Barking and Dagenham | 2.9 |
| Ford Wind Park - Dagenhamwind farm | wind farm | 5.9 | operationalupdated Aug 2011 | Mar 2003 | granted Jul 2003 | Aug 2011 | Barking and Dagenham | 2.9 |
| Riverside Resource Recovery Facility Battery Storagebattery storage | battery storage | 2.5 | under constructionupdated Jan 2021 | Dec 2020 | — | Jan 2021 | Bexley | 3.4 |
| Riverside Energy Parkbattery storage | battery storage | 20 | approved, not built may be out of dateupdated Apr 2022 | Nov 2018 | granted Apr 2020 | Apr 2022 | Bexley | 3.5 |
| Riverside Energy Park (REP)rooftop solar | rooftop solar | 1 | approved, not built may be out of dateupdated Sep 2020 | Nov 2018 | granted Apr 2020 | Sep 2020 | Bexley | 3.5 |
| Aveley Landfill, Sandy Lane PV Solar Array & Battery Energy Storagesolar farm | solar farm | 16 | approved, not builtupdated Feb 2025 | Feb 2024 | granted Jul 2024 | Feb 2025 | Thurrock | 4.0 |
| Crossness Sewage Works PVrooftop solar | rooftop solar | 1.5 | operationalupdated Jan 2012 | — | — | Jan 2012 | Bexley | 4.2 |
| Ocado Operating Limited, New Purfleet Roadrooftop solar | rooftop solar | 2.8 | approved, not builtupdated May 2025 | Mar 2025 | granted May 2025 | May 2025 | Thurrock | 4.2 |
| Crossness Sewage Works Turbinewind turbine | wind turbine | 2.5 | operationalupdated Jan 2015 | Nov 2010 | granted Dec 2010 | Jan 2015 | Bexley | 4.3 |
| Little Belhus Restoration Sitewind farm | wind farm | 1 | operationalupdated Jan 2017 | Nov 2013 | granted May 2015 | Jan 2017 | Thurrock | 5.9 |
| Atcost Roadbattery storage | battery storage | 100 | application submitted may be out of dateupdated May 2024 | May 2024 | — | May 2024 | Barking and Dagenham | 6.1 |
| Tesco, Cygnet View Solar PV Arraysrooftop solar | rooftop solar | 1.1 | approved, not builtupdated Apr 2026 | Jan 2026 | granted Mar 2026 | Apr 2026 | Thurrock | 7.0 |
| Medebridge Road Solar Farmsolar farm | solar farm | 49.9 | operationalupdated Nov 2025 | Feb 2022 | granted May 2022 | Nov 2025 | Thurrock | 7.1 |
| Cranham Golf Course Solar Parksolar farm | solar farm | 2.6 | operationalupdated Feb 2017 | Jun 2014 | granted Aug 2015 | Feb 2017 | Havering | 7.3 |
| Cranham Golf Coursesolar farm | solar farm | 2.6 | refusedupdated Feb 2015 | Nov 2014 | refused Jan 2015 | Feb 2015 | Havering | 7.3 |
| Intu Lakeside, West Thurrock Wayrooftop solar | rooftop solar | 1.3 | approved, not builtupdated Sep 2024 | Jul 2024 | granted Sep 2024 | Sep 2024 | Thurrock | 7.6 |
| Clay Tye Farm Energy Storage Facilitybattery storage | battery storage | 200 | application submittedupdated Jul 2026 | May 2026 | — | Jul 2026 | Havering | 7.7 |
| Clay Tye Farm Phase 1 - Storage Facilitybattery storage | battery storage | 49.5 | operationalupdated Mar 2024 | Apr 2017 | granted Mar 2023 | Mar 2024 | Havering | 7.7 |
| Clay Tye Farm Phase 2 - Storage Facilitybattery storage | battery storage | 49.5 | operationalupdated Mar 2024 | Jun 2018 | granted Feb 2020 | Mar 2024 | Havering | 7.7 |
| Beckton Sewage Treatment Workswind farm | wind farm | 2.2 | operationalupdated Feb 2015 | — | — | Feb 2015 | Newham | 7.8 |
| Littlebrook Battery Storagebattery storage | battery storage | 7.5 | operationalupdated Feb 2026 | Jul 2016 | granted Sep 2016 | Feb 2026 | Dartford | 8.3 |
| Albion Roadbattery storage | battery storage | 5 | application withdrawnupdated Jun 2020 | Jul 2019 | — | Jun 2020 | Dartford | 8.3 |
| Clay Tye Farmsolar farm | solar farm | 15.9 | refusedupdated May 2016 | Sep 2014 | refused Jan 2015 | May 2016 | Havering | 8.5 |
| Ockendon Landfill Solar Farmsolar farm | solar farm | 38 | operationalupdated Sep 2023 | Jul 2014 | granted Jan 2016 | Sep 2023 | Thurrock | 8.8 |
| Fen Lane, Bulphan Solar Farmsolar farm | solar farm | 49.9 | under constructionupdated Mar 2024 | Jan 2021 | granted Jul 2021 | Mar 2024 | Havering | 9.2 |
| Clay Tye Road Solar Farmsolar farm | solar farm | 49.9 | application submitted may be out of dateupdated May 2021 | Apr 2021 | — | May 2021 | Thurrock | 9.2 |
| Land Adjacent Davanden Kennelsbattery storage | battery storage | 7.5 | abandonedupdated Feb 2020 | May 2018 | — | Feb 2020 | Dartford | 9.3 |
| Neatscourtbattery storage | battery storage | 1 | abandonedupdated Jun 2020 | Jun 2017 | — | Jun 2020 | Dartford | 9.5 |
| Manor Farm, Dartford Roadbattery storage | battery storage | 212 | application submittedupdated Jul 2025 | Jun 2025 | — | Jul 2025 | Bexley | 9.8 |
Smaller schemes under 1 MW, mostly rooftop solar (52)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated | Council | km |
|---|---|---|---|---|---|---|---|---|
| Ceme Campus, Marsh Wayrooftop solar | rooftop solar | 0.9 | approved, not builtupdated May 2023 | Feb 2023 | granted Apr 2023 | May 2023 | Havering | 1.6 |
| JJ Food Service, Orion Park Messina Wayrooftop solar | rooftop solar | 0.6 | approved, not builtupdated Oct 2023 | Oct 2023 | granted Nov 2023 | Oct 2023 | Barking and Dagenham | 3.3 |
| Thames Gateway Park, Choats Roadrooftop solar | rooftop solar | 0.5 | approved, not builtupdated Jun 2023 | May 2023 | granted Jun 2023 | Jun 2023 | Barking and Dagenham | 3.4 |
| Hunters Hall Primary School, Alibon Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jul 2024 | May 2024 | granted Jul 2024 | Jul 2024 | Barking and Dagenham | 3.5 |
| Pooles Lanerooftop solar | rooftop solar | 0.3 | approved, not builtupdated Nov 2025 | Jul 2025 | granted Aug 2025 | Nov 2025 | Barking and Dagenham | 3.8 |
| Aveley Landfill, Sandy Lane PV Solar Array & Battery Energy Storagebattery storage | battery storage | — | approved, not builtupdated Feb 2025 | Feb 2024 | granted Jul 2024 | Feb 2025 | Thurrock | 4.0 |
| Barking And Dagenham College, Dagenham Roadrooftop solar | rooftop solar | 0.8 | approved, not builtupdated Jun 2025 | Mar 2025 | granted May 2025 | Jun 2025 | Barking and Dagenham | 4.1 |
| Barking & Dagenham College Of Technology, Dagenham Road Solarrooftop solar | rooftop solar | — | no application requiredupdated May 2025 | Apr 2025 | — | May 2025 | Barking and Dagenham | 4.1 |
| Goresbrook School, Cook Roadrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Jun 2026 | Mar 2026 | granted May 2026 | Jun 2026 | Barking and Dagenham | 4.3 |
| Thames Innovation Centre, Veridion Wayrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Sep 2025 | May 2025 | granted Jul 2025 | Sep 2025 | Bexley | 4.7 |
| James Watt Wayrooftop solar | rooftop solar | 0.6 | approved, not builtupdated Nov 2021 | Nov 2021 | granted Jan 2022 | Nov 2021 | Bexley | 5.0 |
| Liberty Shopping Centre, Western Roadrooftop solar | rooftop solar | 0.5 | approved, not builtupdated Apr 2024 | Jan 2024 | granted Mar 2024 | Apr 2024 | Havering | 6.0 |
| Manor Joinery Estate, Eastern Approach Alfreds Wayrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Mar 2023 | Dec 2022 | granted Feb 2023 | Mar 2023 | Barking and Dagenham | 6.0 |
| Nic Ice, Thames Roadrooftop solar | rooftop solar | — | approved, not builtupdated Jan 2025 | Nov 2024 | granted Dec 2024 | Jan 2025 | Barking and Dagenham | 6.1 |
| Dagenham Motors, Ripple Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jun 2023 | May 2023 | granted Jun 2023 | Jun 2023 | Barking and Dagenham | 6.1 |
| Tesco Store Cygnet Viewrooftop solar | rooftop solar | 0.6 | approved, not builtupdated Sep 2020 | Mar 2019 | granted Apr 2019 | Sep 2020 | Thurrock | 6.2 |
| Twin Tumps Wayrooftop solar | rooftop solar | 0.6 | operationalupdated Mar 2022 | Feb 2022 | granted Dec 2022 | Mar 2022 | Greenwich | 6.5 |
| DSV Road, Stonehouse Lanerooftop solar | rooftop solar | 0.3 | approved, not builtupdated Nov 2024 | Sep 2024 | granted Nov 2024 | Nov 2024 | Thurrock | 6.7 |
| David Lloyd Leisure, Gidea Parkrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Aug 2023 | Jun 2023 | granted Jul 2023 | Aug 2023 | Havering | 6.7 |
| Ford Retail, Triton Centre Weston Avenuerooftop solar | rooftop solar | 0.8 | approved, not builtupdated Jan 2023 | Nov 2022 | granted Jan 2023 | Jan 2023 | Thurrock | 7.2 |
| Pumping Station, Corran Way - Micro Energy Storage Systembattery storage | battery storage | 0.2 | approved, not builtupdated Feb 2025 | Aug 2024 | granted Jan 2025 | Feb 2025 | Thurrock | 7.3 |
| Pumping Station, West Thurrock Way - Micro Energy Storagebattery storage | battery storage | 0.2 | approved, not builtupdated Nov 2024 | Sep 2024 | granted Oct 2024 | Nov 2024 | Thurrock | 7.5 |
| Circular 13, Unit B, Gascoigne Roadrooftop solar | rooftop solar | 1 | approved, not builtupdated Jun 2023 | Apr 2023 | granted Jun 2023 | Jun 2023 | Barking and Dagenham | 7.6 |
| One Hundred House, Brunel Wayrooftop solar | rooftop solar | 0.8 | approved, not builtupdated Aug 2023 | Jul 2023 | granted Aug 2023 | Aug 2023 | Dartford | 7.7 |
| Littlebrook DC1, Shield Roadrooftop solar | rooftop solar | 0.6 | approved, not builtupdated Jul 2025 | May 2025 | granted Jul 2025 | Jul 2025 | Dartford | 7.7 |
| New England Industrial Estate Developmentrooftop solar | rooftop solar | 0.2 | under constructionupdated May 2023 | Mar 2021 | granted Sep 2021 | May 2023 | Barking and Dagenham | 7.8 |
| Romford Halal Meats, Folkes Lanerooftop solar | rooftop solar | 0.2 | approved, not built may be out of dateupdated Jan 2023 | Sep 2022 | granted Dec 2022 | Jan 2023 | Havering | 8.0 |
| Northern Gateway Distribution Centre, Central Road Northrooftop solar | rooftop solar | 0.8 | approved, not builtupdated Jan 2024 | Nov 2023 | granted Jan 2024 | Jan 2024 | Dartford | 8.1 |
| Northern Gateway Distribution Centre,Central Road Northrooftop solar | rooftop solar | 0.6 | application submitted | Jun 2026 | — | — | Dartford | 8.2 |
| Atlantis Avenue, Beckton Solar PV Systemsrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Jun 2023 | Apr 2023 | granted Jun 2023 | Jun 2023 | Newham | 8.3 |
| King George Hospital, Barley Lanerooftop solar | rooftop solar | 0.8 | application submittedupdated Feb 2026 | Jan 2026 | — | Feb 2026 | Redbridge | 8.3 |
| The Mallrooftop solar | rooftop solar | — | approved, not builtupdated Mar 2026 | Nov 2025 | granted Jan 2026 | Mar 2026 | Bexley | 8.3 |
| Bexleyheath Superbowl, Albion Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Oct 2023 | Aug 2023 | granted Oct 2023 | Oct 2023 | Bexley | 8.4 |
| Harris Academy Chafford Hundred, Chafford Hundred Solar Aarrayrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Apr 2025 | Feb 2025 | granted Mar 2025 | Apr 2025 | Thurrock | 8.5 |
| Warley Energy Hub, Ockendenbattery storage | battery storage | 0.2 | approved, not builtupdated Sep 2025 | Nov 2024 | granted Aug 2025 | Sep 2025 | Havering | 8.7 |
| Sainsbury, Claps Gate Lanerooftop solar | rooftop solar | 0.4 | application submitted | May 2026 | — | — | Newham | 8.7 |
| William Torbitt School, Eastern Avenuerooftop solar | rooftop solar | 0.2 | application submitted | May 2026 | — | — | Redbridge | 8.8 |
| Dartford Grammar School For Boys, West Hillrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Sep 2024 | Jul 2024 | granted Sep 2024 | Sep 2024 | Dartford | 8.9 |
| The I O Centre, Skeffington Streetrooftop solar | rooftop solar | 0.2 | refusedupdated Feb 2026 | Nov 2025 | refused Jan 2026 | Feb 2026 | Greenwich | 8.9 |
| Riverbridge House, Admirals Parkrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Jul 2023 | May 2023 | granted Jul 2023 | Jul 2023 | Dartford | 8.9 |
| Bower Park Academyrooftop solar | rooftop solar | 0.3 | operationalupdated Dec 2021 | Jan 2021 | granted Oct 2021 | Dec 2021 | Havering | 9.0 |
| University Of East London Dockland Campus, University Way - Soalr Panelsrooftop solar | rooftop solar | — | approved, not builtupdated Jan 2024 | Oct 2023 | granted Dec 2023 | Jan 2024 | Newham | 9.0 |
| London Design and Engineering UTC, University Waywind farm | wind farm | 0.2 | application submitted | May 2026 | — | — | Newham | 9.1 |
| The Exchange Mall, High Roadrooftop solar | rooftop solar | 0.7 | approved, not builtupdated Dec 2024 | Oct 2024 | granted Nov 2024 | Dec 2024 | Redbridge | 9.1 |
| Knowledge Dock, University Wayrooftop solar | rooftop solar | 0.1 | approved, not builtupdated Sep 2023 | Jul 2023 | granted Sep 2023 | Sep 2023 | Newham | 9.2 |
| Central Park Leisurerooftop solar | rooftop solar | 0.4 | approved, not builtupdated Jan 2025 | Oct 2024 | granted Nov 2024 | Jan 2025 | Havering | 9.3 |
| Littlebrook Hospital, Bow Arrow Lanerooftop solar | rooftop solar | — | approved, not builtupdated Jul 2026 | Apr 2026 | granted Jun 2026 | Jul 2026 | Dartford | 9.4 |
| Fairfield Pool, Lowfield Streetrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Oct 2023 | Jul 2023 | granted Oct 2023 | Oct 2023 | Dartford | 9.7 |
| Fairfield Centre, Lowfield Streetrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Oct 2023 | Aug 2023 | granted Oct 2023 | Oct 2023 | Dartford | 9.7 |
| Peri Limited, Greenways Solar Photovoltaicsrooftop solar | rooftop solar | 0.5 | approved, not builtupdated Jan 2023 | Nov 2022 | granted Dec 2022 | Jan 2023 | Brentwood | 9.7 |
| Brookhill Estate Regenerationrooftop solar | rooftop solar | 0.1 | approved, not built may be out of dateupdated May 2022 | Apr 2022 | granted Mar 2023 | May 2022 | Greenwich | 9.9 |
| Plashet Schoolrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Aug 2025 | May 2025 | granted Jul 2025 | Aug 2025 | Newham | 10.0 |
Distance from the average position of the RM13 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.
By type
| Type | All | Pending | Approved | Operational | Refused | MW in pipeline |
|---|---|---|---|---|---|---|
| Solar farm | 8 | 1 | 2 | 3 | 2 | 116 |
| Rooftop solar | 52 | 4 | 43 | 3 | 1 | 23.1 |
| Wind farm | 4 | 1 | 0 | 3 | 0 | 0.2 |
| Wind turbine | 2 | 0 | 0 | 2 | 0 | 0 |
| Battery storage | 15 | 3 | 6 | 3 | 0 | 535 |
MW in pipeline: pending, approved and under-construction capacity.
How Havering decides solar, wind and battery applications
| Applications | Havering | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 13 | 10,236 |
| Refused | 5 (38%) | 19% |
| Solar refused | 3 of 10 | 12% |
| Battery storage refused | 2 of 3 | 16% |
| Median time from submission to decision | 17.1 weeks | 17.0 weeks |
| Appeals lodged / allowed | 2 / 1 | — |
Is the status up to date?
32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near RM13, 6 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.