Battery Energy Storage System Development in Drumquin (87.8 MW)

Battery Energy Storage System Development in Drumquin is an 87.8 MW battery storage project in Fermanagh and Omagh, Northern Ireland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 15 November 2024, no decision recorded; the record was last updated on 20 January 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

87.8 MWbattery storage
application submittedstatus in REPD
20 January 2025record last updated
Fermanagh and Omaghcouncil area

Planning timeline

DateStage
15 November 2024Application submitted

Project details

Technology
battery storage (stand-alone storage)
Capacity
87.8 MW
Status (REPD)
application submitted
Record last updated
20 January 2025
Operator or applicant
Lightsource Renewable Energy Ireland Limited
Planning authority
Fermanagh and Omagh
Planning application reference
LA10/2024/1111/F
Address (REPD)
Lands Located Approximately 245m E. of No 164 Dooish Rd. and, Approximately 26m, Drumquin
Council area (by location)
Fermanagh and Omagh
REPD reference
17824

Who decides

ApplicationsFermanagh and OmaghUK
Decided applications (solar, wind, battery)7410,236
Refused12 (16%)19%
Solar refused0 of 112%
Onshore wind refused12 of 7045%
Battery storage refused0 of 316%
Median time from submission to decision87.9 weeks17.0 weeks
Appeals lodged / allowed8 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Curraghamulkin (Dooish Wind Farm)wind farm30operational1.5
Dunnaree Hill Wind Farmwind farm15application withdrawn2.7
Pigeon Topwind farm27under construction2.9
Pollnalaght (Cornavarrow)wind farm38.4operational3.4
Clunahill Wind Farmwind farm21approved, not built3.8
Thornog Windfarmwind farm9.2operational5.4
Thornog Windfarm Extensionwind farm9.2operational5.4
Slieveglasswind farm6.9operational8.1
Castlecraigwind farm25operational8.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.5783, -7.4911).