Clunahill Wind Farm (21 MW)
Clunahill Wind Farm is a 21 MW wind farm project in Fermanagh and Omagh, Northern Ireland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 20 February 2015, not yet built; the record was last updated on 16 September 2019. REPD also records that the planning permission expired on 20 February 2020, so the project may not go ahead in this form. Check the planning authority's register for the latest position.
REPD also records that the planning permission expired on 20 February 2020, so the project may not go ahead in this form.
Planning timeline
| Date | Stage |
|---|---|
| 25 October 2007 | Application submitted |
| 20 February 2015 | Planning permission granted |
| 20 February 2020 | Permission expired |
Project details
- Technology
- wind farm
- Capacity
- 21 MW
- Status (REPD)
- approved, not built
- Record last updated
- 16 September 2019
- Operator or applicant
- ESB (Hibernian Wind)
- Planning authority
- Fermanagh and Omagh
- Planning application reference
- K/2007/0547/F
- Turbines
- 6
- Address (REPD)
- Drumquin
- Council area (by location)
- Fermanagh and Omagh
- Time to decision
- 382 weeks
- REPD reference
- 4251
Who decides
| Applications | Fermanagh and Omagh | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 74 | 10,236 |
| Refused | 12 (16%) | 19% |
| Solar refused | 0 of 1 | 12% |
| Onshore wind refused | 12 of 70 | 45% |
| Battery storage refused | 0 of 3 | 16% |
| Median time from submission to decision | 87.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 8 / 5 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Dunnaree Hill Wind Farm | wind farm | 15 | application withdrawn | 2.1 |
| Battery Energy Storage System Development in Drumquin | battery storage | 87.8 | application submitted | 3.8 |
| Thornog Windfarm Extension | wind farm | 9.2 | operational | 3.8 |
| Thornog Windfarm | wind farm | 9.2 | operational | 3.8 |
| Curraghamulkin (Dooish Wind Farm) | wind farm | 30 | operational | 3.9 |
| Pigeon Top | wind farm | 27 | under construction | 4.3 |
| Slieveglass | wind farm | 6.9 | operational | 5.1 |
| Castlecraig | wind farm | 25 | operational | 5.9 |
| Pollnalaght (Cornavarrow) | wind farm | 38.4 | operational | 6.2 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.6119, -7.5008).