Curraghamulkin (Dooish Wind Farm) (30 MW)
Curraghamulkin (Dooish Wind Farm) is a 30 MW wind farm project in Fermanagh and Omagh, Northern Ireland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 15 July 2018; the record was last updated on 30 October 2018.
30 MWwind farm
operationalstatus in REPD
30 October 2018record last updated
Fermanagh and Omaghcouncil area
Planning timeline
| Date | Stage |
|---|---|
| 12 March 2008 | Application submitted |
| 22 January 2016 | Appeal lodged |
| 25 January 2016 | Refused by the planning authority |
| 10 November 2017 | Planning permission granted |
| 10 November 2017 | Appeal allowed |
| 15 January 2018 | Construction started |
| 15 July 2018 | Operational |
Project details
- Technology
- wind farm
- Capacity
- 30 MW
- Status (REPD)
- operational
- Record last updated
- 30 October 2018
- Operator or applicant
- DW Consultancy
- Planning authority
- Fermanagh and Omagh
- Planning application reference
- K/2008/0334/F
- Appeal reference
- 2015/A0200
- Turbines
- 10
- Turbine height
- 130 m
- Address (REPD)
- Coolavannagh TD, Curraghmulkin TD, Dooish TD, Drumquin
- Council area (by location)
- Fermanagh and Omagh
- Time to decision
- 504 weeks
- REPD reference
- 4151
Who decides
| Applications | Fermanagh and Omagh | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 74 | 10,236 |
| Refused | 12 (16%) | 19% |
| Solar refused | 0 of 1 | 12% |
| Onshore wind refused | 12 of 70 | 45% |
| Battery storage refused | 0 of 3 | 16% |
| Median time from submission to decision | 87.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 8 / 5 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Battery Energy Storage System Development in Drumquin | battery storage | 87.8 | application submitted | 1.5 |
| Dunnaree Hill Wind Farm | wind farm | 15 | application withdrawn | 2.1 |
| Clunahill Wind Farm | wind farm | 21 | approved, not built | 3.9 |
| Pigeon Top | wind farm | 27 | under construction | 4.3 |
| Thornog Windfarm | wind farm | 9.2 | operational | 4.3 |
| Thornog Windfarm Extension | wind farm | 9.2 | operational | 4.3 |
| Pollnalaght (Cornavarrow) | wind farm | 38.4 | operational | 4.8 |
| Slieveglass | wind farm | 6.9 | operational | 7.3 |
| Castlecraig | wind farm | 25 | operational | 7.5 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.5778, -7.5141).