Dunnaree Hill Wind Farm (15 MW)

Dunnaree Hill Wind Farm is a 15 MW wind farm project in Fermanagh and Omagh, Northern Ireland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 1 February 2016; the record was last updated on 4 March 2015.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

15 MWwind farm
application withdrawnstatus in REPD
4 March 2015record last updated
Fermanagh and Omaghcouncil area

Planning timeline

DateStage
13 April 2011Application submitted
1 February 2016Application withdrawn

Project details

Technology
wind farm
Capacity
15 MW
Status (REPD)
application withdrawn
Record last updated
4 March 2015
Operator or applicant
Scottish and Southern Energy (SSE)
Planning authority
Fermanagh and Omagh
Planning application reference
K/2011/0237/F
Turbines
6
Address (REPD)
approximately 2km southwest of Drumquin, and 13.2km west of Omagh in Co. Tyrone
Council area (by location)
Fermanagh and Omagh
REPD reference
4173

Who decides

ApplicationsFermanagh and OmaghUK
Decided applications (solar, wind, battery)7410,236
Refused12 (16%)19%
Solar refused0 of 112%
Onshore wind refused12 of 7045%
Battery storage refused0 of 316%
Median time from submission to decision87.9 weeks17.0 weeks
Appeals lodged / allowed8 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Curraghamulkin (Dooish Wind Farm)wind farm30operational2.1
Clunahill Wind Farmwind farm21approved, not built2.1
Battery Energy Storage System Development in Drumquinbattery storage87.8application submitted2.7
Thornog Windfarm Extensionwind farm9.2operational2.9
Thornog Windfarmwind farm9.2operational2.9
Pigeon Topwind farm27under construction4.6
Slieveglasswind farm6.9operational5.4
Castlecraigwind farm25operational5.9
Pollnalaght (Cornavarrow)wind farm38.4operational5.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.5962, -7.5189).