Glebe Farm, Curdridge Lane Solar Farm (10 MW)

Glebe Farm, Curdridge Lane Solar Farm is a 10 MW solar farm project in Winchester, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 22 May 2025, no decision recorded; the record was last updated on 15 July 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

10 MWsolar farm
application submittedstatus in REPD
15 July 2025record last updated
Winchestercouncil area

Planning timeline

DateStage
22 May 2025Application submitted

Project details

Technology
solar farm
Capacity
10 MW
Status (REPD)
application submitted
Record last updated
15 July 2025
Operator or applicant
Glebe Farm Energy Limited
Planning authority
Winchester
Planning application reference
25/01050/FUL
Site area
21.4 ha
Address (REPD)
Glebe Farm, Curdridge Lane, Waltham Chase, Southampton
Council area (by location)
Winchester
Name in REPD
Glebe Farm, Curdridge Lane - Solar Farm
REPD reference
17265

Recorded together with Glebe Farm, Curdridge Lane (battery storage, application submitted).

Who decides

ApplicationsWinchesterUK
Decided applications (solar, wind, battery)3710,236
Refused4 (11%)19%
Solar refused0 of 2412%
Onshore wind refused3 of 345%
Battery storage refused1 of 1016%
Median time from submission to decision14.7 weeks17.0 weeks
Appeals lodged / allowed3 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
New Farm House Locks Farmsolar farm18approved, not built0.8
Bishop’s Waltham Solar Farmsolar farm12operational1.0
Raglington Farmsolar farm5.8operational2.4
Titchfield Lane, Wickhamsolar farm49.9approved, not built3.7
Fontley House Farmsolar farm10approved, not built4.4
Ash Farm, Titchfield Lanebattery storage15approved, not built5.5
Titchfield Lanebattery storage49under construction5.8
Funtley Solar Photovoltaic PV Farmsolar farm10.5application submitted6.0
Funtley Refuse Tipsolar farm10permission expired6.2

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (50.9355, -1.2122).