Energy Projects Near You

Solar Farm at Leaford Solar Farm (30 MW)

Solar Farm at Leaford Solar Farm is a 30 MW solar farm project in Stafford, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 19 June 2024, no decision recorded; the record was last updated on 15 July 2024. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

30 MWsolar farm
application submittedmay be out of datestatus in REPD
15 July 2024record last updated
Staffordcouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
19 June 2024Application submitted

Project details

Technology
solar farm
Capacity
30 MW
Status (REPD)
application submitted
Record last updated
15 July 2024
Operator or applicant
Renewable Energy Systems
Planning authority
Stafford
Planning application reference
24/38719/FUL
Site area
69.2 ha
Address (REPD)
Leaford Solar Farm, Fulford Lane, Blythe Bridge, Stoke on Trent
Council area (by location)
Stafford
Name in REPD
Leaford Solar Farm, Fulford Lane - Solar Farm
REPD reference
14358

Who decides

ApplicationsStaffordUK
Decided applications (solar, wind, battery)2010,236
Refused5 (25%)19%
Solar refused3 of 1412%
Onshore wind refused1 of 145%
Battery storage refused1 of 516%
Median time from submission to decision16.3 weeks17.0 weeks
Appeals lodged / allowed2 / 2—

Other large projects within 10 km

ProjectTypeMWStatuskm
Solar Farm at New Buildings Solar Farmsolar farm40application submitted2.3
Upper Newton Farm (Blythe House) Solar Farm & Battery Storagesolar farm27.7approved, not built3.1
Upper Newton Farm (Blythe House) Solar Farm & Battery Storagebattery storage30approved, not built3.1
Lower Newton Farmsolar farm11.5operational3.1
Blythe House Farm Extensionsolar farm16.6approved, not built3.3
Totmonslow Farm, Upper Tean Solar Farmsolar farm19.8approved, not built3.8
The Fields Farmsolar farm5refused4.0
Draycott Cross Roadbattery storage40approved, not built4.8
Land at Heywood Grangesolar farm8.4operational5.2

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.9506, -2.0662).