Solar, wind and battery projects near Bristol (BS16)
79 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of BS16 (South Gloucestershire): 7 are waiting for a planning decision, 54 approved but not yet running, 14 operational. The largest live scheme is Westerleigh Hill, Westerleigh (200 MW battery storage, approved on 19 July 2024, not yet built), 5.0 km away. Source: Renewable Energy Planning Database, July 2026 extract.
Projects within 10 km of BS16
Projects of 1 MW and more (34)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated | Council | km |
|---|---|---|---|---|---|---|---|---|
| Partfield Farmwind farm | wind farm | 5.6 | application withdrawnupdated Feb 2004 | Oct 2000 | — | Feb 2004 | South Gloucestershire | 1.9 |
| Folly Brook Road, Emersons Greenrooftop solar | rooftop solar | 1 | approved, not builtupdated Oct 2022 | Aug 2022 | granted Oct 2022 | Oct 2022 | South Gloucestershire | 2.8 |
| Amcor Flexiblesrooftop solar | rooftop solar | 1.7 | operationalupdated Apr 2016 | Jun 2015 | granted Jul 2015 | Apr 2016 | South Gloucestershire | 4.1 |
| Lockleaze Energy Storagebattery storage | battery storage | 15 | operationalupdated Jan 2019 | Mar 2017 | — | Jan 2019 | Bristol | 4.3 |
| Solar Panels at Oakley Green Farm Oakleigh Green Farm Lane Westerleighsolar farm | solar farm | 1.2 | approved, not builtupdated Jul 2025 | Feb 2025 | granted Jun 2025 | Jul 2025 | South Gloucestershire | 4.9 |
| Westerleigh Hill, Westerleighbattery storage | battery storage | 200 | approved, not builtupdated Aug 2024 | Mar 2023 | granted Jul 2024 | Aug 2024 | South Gloucestershire | 5.0 |
| Airbus UK Industrial Complexrooftop solar | rooftop solar | 3.1 | approved, not builtupdated May 2024 | Mar 2024 | granted Apr 2024 | May 2024 | South Gloucestershire | 5.5 |
| Feeder Roadbattery storage | battery storage | 20 | operationalupdated Jan 2024 | Oct 2019 | granted Mar 2020 | Jan 2024 | Bristol | 5.8 |
| Philip Street Car Breakersbattery storage | battery storage | 7.2 | approved, not built may be out of dateupdated Jun 2023 | May 2020 | granted Jun 2020 | Jun 2023 | Bristol | 5.9 |
| Grange Farm (Avon)solar farm | solar farm | 21 | operationalupdated May 2015 | Oct 2013 | granted Jan 2014 | May 2015 | South Gloucestershire | 5.9 |
| Hammond Court Farmsolar farm | solar farm | 15 | operationalupdated Dec 2016 | Jul 2014 | granted Feb 2015 | Dec 2016 | South Gloucestershire | 6.0 |
| Rolls Royce Filton Campus Building 185rooftop solar | rooftop solar | 1.8 | operationalupdated Feb 2017 | Jan 2016 | granted Mar 2016 | Feb 2017 | South Gloucestershire | 6.0 |
| Rolls Royce Filton Campus Building 184rooftop solar | rooftop solar | 1.4 | operationalupdated Feb 2017 | Jan 2016 | granted Mar 2016 | Feb 2017 | South Gloucestershire | 6.0 |
| Perrinpit Farmsolar farm | solar farm | 49.9 | under constructionupdated Aug 2025 | Mar 2021 | granted Sep 2022 | Aug 2025 | South Gloucestershire | 6.5 |
| Says Court Farm, Coalpit Heathbattery storage | battery storage | 50 | approved, not built may be out of dateupdated Aug 2022 | Jul 2022 | granted Nov 2022 | Aug 2022 | South Gloucestershire | 6.6 |
| Says Court Farm solar parksolar farm | solar farm | 19.8 | operationalupdated Apr 2014 | Apr 2013 | granted Oct 2013 | Apr 2014 | South Gloucestershire | 6.6 |
| Mousewell Farm, Besom Lane Solar Farmsolar farm | solar farm | 22 | application submittedupdated Jan 2025 | Dec 2024 | — | Jan 2025 | South Gloucestershire | 6.8 |
| Codrington Roadsolar farm | solar farm | 18.8 | approved, not builtupdated Jul 2022 | Oct 2022 | granted Aug 2023 | Jul 2022 | South Gloucestershire | 6.8 |
| Elm Farm solar farm and Battery storagesolar farm | solar farm | 24 | refusedupdated Mar 2021 | Jul 2021 | refused Jan 2022 | Mar 2021 | South Gloucestershire | 7.1 |
| Ring O Bells Farmsolar farm | solar farm | 5 | operationalupdated Oct 2016 | Jun 2014 | granted Aug 2015 | Oct 2016 | South Gloucestershire | 7.9 |
| Emergency Air Operation Base, Gloucester Roadsolar farm | solar farm | 6 | application submittedupdated Apr 2026 | Jan 2026 | — | Apr 2026 | South Gloucestershire | 7.9 |
| Old Green Farm, Alveston Battery Storagebattery storage | battery storage | 10 | approved, not built may be out of dateupdated Aug 2020 | Apr 2017 | granted Nov 2019 | Aug 2020 | South Gloucestershire | 8.1 |
| Green Farmsolar farm | solar farm | 9.4 | refused on appealupdated Jan 2016 | May 2014 | refused Oct 2014 | Jan 2016 | South Gloucestershire | 8.1 |
| Oakham Farmsolar farm | solar farm | 8 | operationalupdated Apr 2016 | May 2015 | granted Oct 2015 | Apr 2016 | South Gloucestershire | 8.1 |
| Parklandssolar farm | solar farm | 4.6 | operationalupdated Mar 2016 | May 2015 | granted Oct 2015 | Mar 2016 | South Gloucestershire | 8.4 |
| Earthcott Green Farm, Earthcott Greenbattery storage | battery storage | 200 | approved, not builtupdated Aug 2025 | Mar 2023 | granted Jul 2025 | Aug 2025 | South Gloucestershire | 8.6 |
| Larks Lane & Latteridge Lane, Latteridgebattery storage | battery storage | 49.9 | approved, not builtupdated Feb 2024 | Aug 2023 | granted Jan 2024 | Feb 2024 | South Gloucestershire | 9.0 |
| Iron Acton Substation, Latteridge Lanebattery storage | battery storage | 99 | approved, not builtupdated Sep 2024 | Aug 2023 | granted Aug 2024 | Sep 2024 | South Gloucestershire | 9.2 |
| Cattybrook Solar Farmsolar farm | solar farm | 49.9 | approved, not builtupdated Feb 2026 | Dec 2023 | granted Apr 2025 | Feb 2026 | South Gloucestershire | 9.3 |
| Lower Larks Farmbattery storage | battery storage | 99.9 | approved, not built may be out of dateupdated Jun 2023 | Jul 2022 | granted Apr 2023 | Jun 2023 | South Gloucestershire | 9.3 |
| Larks Lane, Iron Actonbattery storage | battery storage | 20 | application submitted may be out of dateupdated Jun 2023 | May 2023 | — | Jun 2023 | South Gloucestershire | 9.5 |
| Alveston Wind Parkwind farm | wind farm | 6.9 | operationalupdated Dec 2017 | Jun 2008 | granted Nov 2008 | Dec 2017 | South Gloucestershire | 9.5 |
| Patch Elm Lanebattery storage | battery storage | 35 | approved, not built may be out of dateupdated Mar 2022 | Nov 2021 | granted Mar 2022 | Mar 2022 | South Gloucestershire | 9.7 |
| The Wave Solar & Battery Developmentsolar farm | solar farm | 3 | approved, not built may be out of dateupdated May 2021 | Feb 2021 | granted Oct 2021 | May 2021 | South Gloucestershire | 9.7 |
Smaller schemes under 1 MW, mostly rooftop solar (45)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated | Council | km |
|---|---|---|---|---|---|---|---|---|
| David Lloyd Leisure Club, Willowherb Roadrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Sep 2023 | Jul 2023 | granted Sep 2023 | Sep 2023 | South Gloucestershire | 2.1 |
| Sainsburys Supermarkets Limited, The Villagerooftop solar | rooftop solar | 0.5 | approved, not builtupdated Apr 2024 | Feb 2024 | granted Mar 2024 | Apr 2024 | South Gloucestershire | 2.5 |
| Iaaps, Newlands Lane Solar Panels & Hydrogen Storagerooftop solar | rooftop solar | 0.7 | approved, not built may be out of dateupdated Nov 2022 | Sep 2022 | granted Oct 2022 | Nov 2022 | South Gloucestershire | 2.5 |
| Emerald Park, Emersons Greenrooftop solar | rooftop solar | 0.2 | approved, not builtupdated May 2023 | Mar 2023 | granted May 2023 | May 2023 | South Gloucestershire | 2.6 |
| Sainsburys Superstore, Regent Streetrooftop solar | rooftop solar | 0.2 | application submitted | Jun 2026 | — | — | South Gloucestershire | 2.7 |
| University Of West Of England, Coldharbour Lanerooftop solar | rooftop solar | 0.6 | approved, not builtupdated Sep 2024 | Jul 2024 | granted Sep 2024 | Sep 2024 | South Gloucestershire | 3.1 |
| Stoke Gifford Bypass, Curtis Lane - Micro Energy Storage Systembattery storage | battery storage | 0.2 | approved, not builtupdated Apr 2026 | Dec 2025 | granted Mar 2026 | Apr 2026 | South Gloucestershire | 3.1 |
| DPD Bristol, Emersons Greenrooftop solar | rooftop solar | 0.5 | approved, not builtupdated Apr 2024 | Jan 2024 | granted Mar 2024 | Apr 2024 | South Gloucestershire | 3.4 |
| Parkway Advanced Engineering Centre, New Roadrooftop solar | rooftop solar | — | approved, not builtupdated Mar 2025 | Aug 2024 | granted Sep 2024 | Mar 2025 | South Gloucestershire | 4.0 |
| Warmley Park School, Tower Roadrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Jun 2026 | Mar 2026 | granted May 2026 | Jun 2026 | South Gloucestershire | 4.0 |
| Abbey Wood Retail Park, Station Roadrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Oct 2023 | Sep 2023 | granted Oct 2023 | Oct 2023 | South Gloucestershire | 4.1 |
| Lockleaze Sports Centre, Bonnington Walkbattery storage | battery storage | 0.2 | approved, not builtupdated Oct 2023 | Feb 2023 | granted Oct 2023 | Oct 2023 | Bristol | 4.1 |
| Bonnington Walk, Lockleaze - Micro Energy Storage Facilitybattery storage | battery storage | 0.2 | approved, not builtupdated May 2025 | Feb 2025 | granted Apr 2025 | May 2025 | Bristol | 4.1 |
| Lockleaze Sports Centre, Bonnington Walk - Micro Energy Storagebattery storage | battery storage | 0.2 | approved, not builtupdated Jan 2026 | Oct 2025 | granted Dec 2025 | Jan 2026 | Bristol | 4.1 |
| Abbey Wood Retail Park, Filtonrooftop solar | rooftop solar | 0.9 | approved, not builtupdated Oct 2023 | Sep 2023 | granted Oct 2023 | Oct 2023 | South Gloucestershire | 4.1 |
| Hollywood Bowl, Aspects Leisure Parkrooftop solar | rooftop solar | 0.2 | approved, not builtupdated May 2022 | May 2022 | granted Jul 2022 | May 2022 | South Gloucestershire | 4.2 |
| Longwell Green Leisure Centrerooftop solar | rooftop solar | 0.1 | approved, not builtupdated Aug 2024 | May 2024 | granted Jul 2024 | Aug 2024 | South Gloucestershire | 4.2 |
| Gallagher Retail Park, Aldermoor Wayrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Mar 2024 | Jan 2024 | granted Feb 2024 | Mar 2024 | South Gloucestershire | 4.5 |
| Hare Breweryrooftop solar | rooftop solar | 0.2 | operationalupdated Feb 2024 | Jul 2019 | granted Aug 2019 | Feb 2024 | South Gloucestershire | 5.2 |
| Carshop Bristol, Bolingbroke Wayrooftop solar | rooftop solar | 0.1 | approved, not builtupdated May 2023 | Mar 2023 | granted May 2023 | May 2023 | South Gloucestershire | 5.5 |
| Avon Meads, Hollywood Bowlrooftop solar | rooftop solar | 0.1 | approved, not builtupdated Nov 2023 | Sep 2023 | granted Nov 2023 | Nov 2023 | Bristol | 5.6 |
| Cotswold House, St Philips Road - olar Panelsrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jul 2024 | Nov 2023 | granted Jun 2024 | Jul 2024 | Bristol | 5.8 |
| Bradley Stoke Leisure Centre, Fiddlers Wood Lanerooftop solar | rooftop solar | 0.4 | approved, not builtupdated Jun 2023 | May 2023 | granted Jun 2023 | Jun 2023 | South Gloucestershire | 6.0 |
| Drive Vauxhall, Avon Streetbattery storage | battery storage | 0.6 | approved, not builtupdated Mar 2023 | Jan 2023 | granted Mar 2023 | Mar 2023 | Bristol | 6.1 |
| Lanercost Resource And Activity Centre Solar Photovoltaics Panelsrooftop solar | rooftop solar | — | application submittedupdated Jan 2026 | Dec 2025 | — | Jan 2026 | Bristol | 6.7 |
| Mousewell Farm, Besom Lane Solar Farmbattery storage | battery storage | — | application submittedupdated Jan 2025 | Dec 2024 | — | Jan 2025 | South Gloucestershire | 6.8 |
| Elm Farm solar farm and Battery storagebattery storage | battery storage | — | refusedupdated Jul 2022 | Jul 2021 | refused Jan 2022 | Jul 2022 | South Gloucestershire | 7.1 |
| Pieminister Kitchens, Charlton Roadrooftop solar | rooftop solar | 0.2 | application submittedupdated Mar 2025 | Mar 2025 | — | Mar 2025 | Bristol | 7.2 |
| Abbotswood Primary School, Kelston Closerooftop solar | rooftop solar | 0.1 | approved, not builtupdated Jun 2026 | Mar 2026 | granted May 2026 | Jun 2026 | South Gloucestershire | 7.5 |
| Dunelm, Centaurus Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jul 2023 | Apr 2023 | granted May 2023 | Jul 2023 | South Gloucestershire | 7.6 |
| Cribbs Causeway, Merlin Roadrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Oct 2022 | Aug 2022 | granted Oct 2022 | Oct 2022 | South Gloucestershire | 7.6 |
| Canons Way, City Centre Solar Photovoltaics Equipmentrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Mar 2026 | Nov 2025 | granted Jan 2026 | Mar 2026 | Bristol | 7.7 |
| All Saints Church, Pembroke Road - Photovoltaic Panelsrooftop solar | rooftop solar | — | approved, not builtupdated May 2026 | Nov 2022 | granted May 2024 | May 2026 | Bristol | 7.9 |
| Great Western Air Ambulance Charity, Gloucester Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jul 2024 | Apr 2024 | granted Jun 2024 | Jul 2024 | South Gloucestershire | 8.0 |
| Morrison Supermarket, Lysander Roadrooftop solar | rooftop solar | — | approved, not builtupdated Dec 2022 | Oct 2022 | granted Dec 2022 | Dec 2022 | South Gloucestershire | 8.0 |
| Talbot Farm, Dyrham Roadwind farm | wind farm | — | approved, not builtupdated Jan 2026 | Apr 2025 | granted Dec 2025 | Jan 2026 | South Gloucestershire | 8.6 |
| Wellsway School, Chandag Road PV Arraysrooftop solar | rooftop solar | 0.1 | approved, not builtupdated Oct 2024 | Jul 2024 | granted Sep 2024 | Oct 2024 | Bath and North East Somerset | 8.7 |
| Yate Leisure Centre, Kennedy Wayrooftop solar | rooftop solar | 0.4 | approved, not builtupdated May 2024 | Mar 2024 | granted Apr 2024 | May 2024 | South Gloucestershire | 8.8 |
| Larks Lane, Iron Actonbattery storage | battery storage | — | approved, not built may be out of dateupdated Oct 2021 | May 2021 | granted Jul 2021 | Oct 2021 | South Gloucestershire | 8.8 |
| Robinson House Nursing Home, Sturminster Road Solar Photovoltaicsrooftop solar | rooftop solar | — | approved, not builtupdated Jan 2025 | Oct 2024 | granted Nov 2024 | Jan 2025 | Bristol | 9.0 |
| Western Drive, Hengroverooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jul 2024 | May 2024 | granted Jul 2024 | Jul 2024 | Bristol | 9.3 |
| Berwick Drive, Almondsbury Solar Photovoltaics Panelssolar farm | solar farm | 0.5 | approved, not built may be out of dateupdated Feb 2022 | Jan 2022 | granted May 2022 | Feb 2022 | South Gloucestershire | 9.3 |
| Cattybrook Solar Farmbattery storage | battery storage | — | approved, not builtupdated Feb 2026 | Dec 2023 | granted Apr 2025 | Feb 2026 | South Gloucestershire | 9.3 |
| Great Western Air Ambulance Charityrooftop solar | rooftop solar | 0.2 | operationalupdated Aug 2024 | — | — | Aug 2024 | Bristol | 9.7 |
| The Wave Solar & Battery Developmentbattery storage | battery storage | — | approved, not built may be out of dateupdated Jan 2023 | Feb 2021 | granted Oct 2021 | Jan 2023 | South Gloucestershire | 9.7 |
Distance from the average position of the BS16 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.
By type
| Type | All | Pending | Approved | Operational | Refused | MW in pipeline |
|---|---|---|---|---|---|---|
| Solar farm | 16 | 2 | 6 | 6 | 2 | 151 |
| Rooftop solar | 38 | 3 | 30 | 5 | 0 | 12.1 |
| Wind farm | 3 | 0 | 1 | 1 | 0 | 0 |
| Battery storage | 22 | 2 | 17 | 2 | 1 | 772 |
MW in pipeline: pending, approved and under-construction capacity.
How South Gloucestershire decides solar, wind and battery applications
| Applications | South Gloucestershire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 79 | 10,236 |
| Refused | 7 (9%) | 19% |
| Solar refused | 3 of 59 | 12% |
| Onshore wind refused | 2 of 4 | 45% |
| Battery storage refused | 2 of 16 | 16% |
| Median time from submission to decision | 11.1 weeks | 17.0 weeks |
| Appeals lodged / allowed | 3 / 1 | — |
All projects in South Gloucestershire
Is the status up to date?
32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near BS16, 11 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.